Laserfiche WebLink
<br />Water Project Loans <br /> <br />~ew Construction Fund loans: <br /> <br />Loan Recipient Name of Project County Amount <br />City of Aurora Water Activity Prairie Waters Pipeline Project Arapahoe & $75,750,000 <br />Enterprise Adams <br /> <br />Total <br /> <br />$75,750,000 <br /> <br />New Severance Tax Trust Fund Perpetual Base Account (PBA) loans: <br /> <br />Southeastern Colorado Water Arkansas Valley Conduit Project Pueblo, $60,600,000 <br />Conservancy District Water Otero & <br />Activity Enterprise Crowley <br />Penrose Water District Water Water Rights Purchase, Raw Water Pipeline and Fremont $ 8,844,570 <br />Activity Enterprise Reservoir Enlargement <br /> Total $69,444,570 <br /> <br />Recommended Non-reimbursable Investments <br /> <br />The CWCB accepts applications for non-reimbursable projects from the Construction Fund until August <br />31 of each year. Applications for non-reimbursable project investments are accepted for: <br /> <br />... Projects or studies of statewide impact or importance. <br /> <br />~. Feasibility studies and projects designed to address statewide, region wide, or basin wide issues. The <br />Board examines whether such studies will result in new loans. <br /> <br />Creates a fund to install, maintain, and operate satellite <br />monitored stream gauges for water rights administration as <br />statutorily authorized. <br /> <br />Complete a digital and geo-referenced bibliography of <br />publicly available studies and data related to the alluvial <br />aquifer system of the Upper Arkansas river, including <br />bedrock aquifers of entire system. <br /> <br />Determine the feasibility of developing a decision support <br />system for the upper Arkansas river, taking into account <br />the basin specific needs and water resource challenges to <br />identify scope, functions, and elements of a decision <br />sup ort system. <br />CWCB Funding for engineering support services to assist staff in <br />Colorado Decision Support conducting technical modeling analysis for in stream flow <br />Ystem Modelina & issues, statewide water supply initiatives, interbasin <br />b . <br />gineering Support compact Issues and other water resources planning support. <br /> <br />CWCB <br />Stream Gage Fund <br /> <br />Division of Water <br />Resources <br />Satellite Monitoring Fund <br />eWCB <br />Upper Arkansas River <br />Basin Groundwater <br />Bibliography <br />CWCB <br />Upper Arkansas River <br />Basin Decision Support <br />System Feasibility Study <br /> <br /> <br />Creates a continuously appropriated fund to install, <br />maintain, and operate stream gauges to monitor and <br />administer in-stream flow water rights and high flood <br />flows as statutorily authorized. <br /> <br />Statewide <br /> <br />$250,000 <br />from <br />prevIOus <br />approp. <br />$350,000 <br /> <br />Statewide <br /> <br />Upper $40,000 <br />Arkansas <br />River basin <br />Upper $200,000 <br />Arkansas <br />River basin <br />Statewide $200,000 <br />