My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00109 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00109 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:44:53 PM
Creation date
3/7/2007 11:07:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/23/2007
Description
CF Section - Review of Water Related Legislation - 2007 Construction Fund Water Projects Projects Bill Update
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />beginning July I, 2007, the sum of two hundred thousand dollars <br />2 ($200,000), or so much thereof as may be necessary, for the board to <br /> <br />3 complete a feasibility study for a decision support system in the upper <br />4 Arkansas river basin upstream of Pueblo reservoir. The study shall <br />5 determine the feasibility of developing a decision support system for the <br /> <br />6 upper Arkansas river basin, taking into account the basin-specific needs <br /> <br />7 and water resource challenges and shall identify the scope, functions, and <br />8 elements of the decision support system as well as the data needs, costs, <br />9 and schedule to develop the decision support system. <br />10 (2) The moneys appropriated in subsection (1) of this section shall <br /> <br />11 remain available for the designated purposes until the project is <br /> <br />12 completed. <br />13 SECTION 7. Colorado decision support system modeling and <br /> <br />14 <br />15 <br /> <br />engineering support services - appropriation. (1) In addition to any <br /> <br />other appropriation, there is hereby appropriated, out of any moneys in the <br /> <br />16 Colorado water conservation board construction fund not otherwise <br /> <br />17 appropriated, to the Colorado water conservation board, for the fiscal year <br /> <br />18 beginning July 1, 2007, the sum of two hundred thousand dollars <br />19 ($200,000), or so much thereof as may be necessary, for engineering <br /> <br />20 support services to assist staffin conducting technical modeling analysis <br /> <br />21 for instream flow issues, statewide water supply initiative issues, <br /> <br />22 interbasin compact issues, and other water resource planning support <br /> <br />23 needs utilizing the Colorado decision support system. <br />24 (2) The moneys appropriated in subsection (1) ofthis section shall <br />25 remain available for the designated purposes until the project is <br /> <br />26 completed. <br /> <br />27 <br /> <br />SECTION 8. Snowmelt timing study - appropriation. (1) In <br /> <br />-9- <br /> <br />DRAFT <br /> <br />.! <br /> <br />DRAFT <br />12.15.06 <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.