My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00106 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00106 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:44:50 PM
Creation date
3/7/2007 11:07:27 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/23/2007
Description
CF Section - New Loans - Wood Lake Mutual Water and Irrigation Co. - Angel Lake Outlet Repair
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Loan Program <br />Project Data Sheet <br /> <br />Borrower: City of Aurora <br /> <br />County: Adams, Arapahoe and Douglas <br /> <br />. <br /> <br />Project Name: Prairie Waters Project (PWP) <br /> <br />Project Type: Pump Station & Pipeline <br /> <br />Drainage Basin: South Platte <br /> <br />Water Source: South Platte/Transmountain <br /> <br />Project Cost: $800 Million - Total Project Funding Sources: Bonds, CWCB, <br />$250 Million - Conveyance System System Revenues <br />Type of Borrower: Middle Income Municipal Projected Project Delivery: 10,OOOAF <br /> <br />Loan: $75 Million <br /> <br />Interest Rate: 3.75% Term: 30 years <br /> <br />Aurora (population 300,000) is located in the eastern Denver metropolitan area. The population is <br />expected to exceed 600,000 people by 2050. Aurora's water supply comes from three major river <br />basins within Colorado and is sensitive to dry or drought conditions. During average and above <br />average years, the water supplies are ample to meet the City's water demands. However, during <br />dry conditions, water supplies are limited because the water rights owned by Aurora are relatively <br />junior. The Prairie Waters Project is a key part of Aurora Water's comprehensive water resource <br />planning. To meet the demands of its existing customers in dry years, and to meet the increasing <br />demands on the system in the future, the goal of the PWP is to supply 10,000 AF/yr by 2010 and <br />15,000 AF/yr by 2017. Aurora Water will accomplish these goals using reusable effluent from its <br />existing portfolio of decreed reusable water rights, supplemented by lawn irrigation return flows and <br />~unior water rights. A key component of the PWP is the Conveyance System which includes three <br />!pumping stations and a 60-inch diameter pipeline to convey raw water from near Brighton, Colorado <br />~o a purification facility near Aurora Reservoir.. . <br /> <br /> <br />I'~ <br />-\ <br />\ <br /> <br />~NORTH <br /> <br />. . ',,~ - ..'~ ~ , <br /> <br />DIA <br /> <br />, <br />; - -' . ..' Monaghan Road <br /> <br />Aurora <br />Reservoir <br /> <br />Denver r', <br />International i ':.:) <br />" ' .j <br />Airport ,', i <br />.. i <br />i <br /> <br />.' <br /> <br />~ <br />~ <br /><l: <br />"'" <br />IS <br />N <br /> <br /> <br />Water <br />Purification <br />F.acilitie~" <br /> <br />.I <br /> <br />Aurora <br />Gravel lakes <br />. ""","-"'-~~~ <br /> <br /> <br />" <br />, <br /> <br />'y"\ <br />E.470 <br />Easement <br /> <br />, <br /> <br />,',"" -~'--""r '. ~:;;:- -~. <br /> <br />- - " I.' <br />I <br />I <br />I <br />/. <br />-. / <br />---.._-- -'. I <br />\ <br />!' AURORA '7 <br />( I ..__~_ #/ <br />(-- -:~ :-.------ ~Iit\ ./'-- <br /> <br />: . I' <br />-r <br /> <br />.- - -.,~ ~ <br /> <br />". _ : ....r_, <br /> <br />c>;\ ,,[ ,\urDri1 <br /> <br />. <br />Proposed <br />Pumping <br />Station ql <br /> <br />Y"iropose,d <br />. Pipelloe''-. <br />Route '.\ <br />, <br />!~ <br /> <br />f~ <br /> <br />I' <br /> <br />LOCATION MAP <br />
The URL can be used to link to this page
Your browser does not support the video tag.