My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISFAPPC01459 (2)
CWCB
>
Instream Flow Appropriations
>
Backfile
>
2001-3000
>
ISFAPPC01459 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 12:22:10 PM
Creation date
2/27/2007 11:09:08 AM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
04CW0088
Stream Name
Tunnel Gulch
Water Division
2
Water District
11
County
Chaffee
Instream Flow App - Doc Type
Correspondence/Memos
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Biologic Flow Recommendation <br />The summer flow recommendation, which meets 3 of 3 criteria and is within the accuracy range <br />of the R2CROSS model is 2.1 cfs (See Table 1). The winter flow recommendation, which meets <br />2 of3 criteria and is within the accuracy range of the R2CROSS model is 1.5 cfs (See Table 1). <br /> <br />Hydrologic Data <br /> <br />After receiving the cooperating agency's biologic recommendation, the CWCB staff conducted <br />an evaluation of the stream hydrology to determine if water was physically available for an <br />instream flow appropriation. The hydro graph below was derived from data collected by the <br />USGS stream gage for Halfmoon Creek near Malta, CO (ID #07083000), which has a drainage <br />area of 23.6 square miles (See Gage Summary in Appendix C). The total drainage area of the <br />Tunnel Gulch Drainage is approximately 3.1 square miles. The period of record for this gage <br />was 1946-1998, the period of record used by staff in their analysis was 1946-1998, or 52 years of <br />record. Table 2 below displays the estimated stream flow of Tunnel Gulch, in terms of a <br />percentage of exceedence. <br /> <br />Table 2: Estimated flow Tunnel Gulch. <br /> <br />Exceedences <br />1% <br />5% <br />10% <br />20% <br />50% <br />80% <br />90% <br />95% <br />99% <br /> <br />January February March Aoril May June July AUllust September October November December <br />1.18 1.05 1.44 3.42 21.00 38.49 38.88 17.60 6.58 3.42 2.50 1.31 <br />0.90 0.81 0.92 2.10 15.50 31.53 26.06 10.77 4.47 2.63 1.71 1.16 <br />0.74 0.68 0.79 1.71 11.95 27.58 21.28 8.10 3.81 2.36 1.44 1.00 <br />0.66 0.59 0.59 1.13 9.19 23.51 15.50 6.04 3.15 1.84 1.21 0.84 <br />0.50 0.46 0.46 0.74 4.86 15.50 9.19 3.94 2.10 1.31 0.91 0.63 <br />0.39 0.35 0.34 0.46 1.84 10.38 5.52 2.63 1.58 0.99 0.71 0.51 <br />0.33 0.31 0.30 0.35 1.21 8.41 4.20 2.23 1.31 0.88 0.64 0.46 <br />0.28 0.26 0.20 0.32 0.91 7.09 3.42 1.97 1.16 0.80 0.58 0.42 <br />0.20 0.22 0.16 0.22 0.64 4.54 2.51 1.58 0.92 0.67 0.45 0.35 <br /> <br />Tunnel Gulch Estimated Stream Flow <br /> <br />4 <br /> <br />1 <br /> <br /> <br /> <br />3 <br /> <br />~ 2 <br />CJ <br /> <br />o <br /> <br />JAN <br /> <br />Fill <br /> <br />MAR <br /> <br />APR <br /> <br />MAY <br /> <br />JLN <br /> <br />JUl <br /> <br />AUG <br /> <br />SEP <br /> <br />OCT <br /> <br />NOV <br /> <br />DEe <br /> <br />Month <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.