My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00088 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:44:21 PM
Creation date
2/20/2007 11:04:57 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/14/2006
Description
WSP Section and ISF Section - Arkansas River ISF Appropriation
Board Meetings - Doc Type
Hearings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Instream Flow Survey Data I <br />The DOW, in September of 2005 and March of 2006, collected stream cross section information, <br />natural environment data, and other data needed to evaluate the 100 cfs instream flow <br />recommendation proposed and supported :by CWCB staff, the City of Pueblo and other local <br />water users. The stream cross section data was analyzed using the R2CROSS program. The <br />R2CROSS output was evaluated using th~ methods described in Nehring (1979) and Espegren <br />(1996). DOW collected physical data at four different cross-section locations at three different <br />discharges (see attached map). The observed flows ranged from a high of260 cfs to a low of 58 <br />cfs. The width of the Arkansas River at the four study sites ranged from 160 feet to 132 feet. <br /> <br />. <br /> <br />Cross-Section Locations <br />Data relating to the individual cross-sections are discussed below: <br /> <br />. Site #1 is located approximately 1/4 mile downstream of Pueblo Reservoir. The bank full <br />width of this cross-section was 151 ft and had a hydraulic slope of less than 1 %. Data <br />collection flows at this site included flows of 58,89, 155 and 260 cfs. <br />. Site #2 is located near the eastern end of Pueblo Reservoir. The bank full width of this <br />cross-section was 132 ft and had a hydraulic slope ofless than 1 %. Data collection flows <br />at this site included flows of 92, 155, 178 and 264 cfs. <br />. Site #3 is located approximately 100 yards down-stream of the railroad bridge crossing <br />the Arkansas River near Reservoir Road. The bank full width of this cross-section was <br />160 ft and had a hydraulic slope of less than 1%. Data collection flows at this site <br />included flows of85, 155, 174 and 252 cfs. <br />. Site #4 is located approximately ~ mile upstream of the confluence with Fountain Creek. <br />The bank full width of this cross-section was 141 ft and had a hydraulic slope of less than <br />1 %. Data collection flows at this site included flows of 82, 136 and 223 cfs. <br /> <br />. <br /> <br />T bl 1 S <br /> <br />Fl Hd r <br /> <br />dCh <br /> <br />1 Ch <br /> <br />t . . <br /> <br />100 f: <br /> <br />a e tream ow lY< rau lCS an aJ;lne arac enstlcs at c s <br /> Cross-section % Wetted Average Depth Average Velocity <br /> Perimeter <br /> #1- Below Reservoir 69.8% 0.89 feet 1.06 ft/s <br /> #2 - Lower State Park 72.0% 0.76 feet 1.33 ft/s <br /> #3 - Below RR-Xing 75.9% 0.53 feet 1.54 ft/s <br />#4 - Above Fountain Ck 61.3% 0.53 feet 2.19 ft/s <br /> <br />A 100 cfs instream flow would provide: <br /> <br />. Enough water to wet approximately 70% of the stream channel at 3 of the four x-section <br />locations and 61 % of the stream channel at cross-section #4; <br />. An average depth of close to 0.5 feet at all four cross-sections and nearly 0.9 feet at <br />cross-section # 1; and <br />. An average velocity of over 1.0 feet per second at all cross-sections. <br /> <br />~. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.