Laserfiche WebLink
<br />When the total flow of the Diversions of water via the And the flow remaining in the <br />Blue River (Qtotal) at the gage High-Miller Ditch for delivery Blue River below the High- <br />I <br />at Slate Creek Bridge for the to the Oxbpw/Floodplain Fish Miller Ditch will be: <br />month of September is: Habitat Improvements will be <br /> limited to: <br />Qtotal > or equal to 125.1 cfs 10 cfs Qtotal-l0 cfs <br />Qtotal < than 125 cfs 7.5 cfs Qtotal-7.5 cfs <br />and> 120.1 cfs <br />Qtotal < or equal to 120 cfs 5 cfs Qtotal-5 cfs <br />and >115.1 cfs 1 <br />Qtotal <or equal to I 15 cfs 5 cfs for 4 out of 7 days Qtotal-5 cfs for 4 contiguous <br />and> 105.1 cfs days out of 7; Qtotal for 3 <br /> contiguous days out of 7. <br />Qtotal < 105.1 cfs no out-of-priority diversion for Qtotal <br /> oxbows <br /> <br />When the total flow of the Diversions of water via the And the flow remaining in the <br />Blue River (Qtotal) "at the gage High-Miller Ditch for delivery Blue River below the High- <br />at Slate Creek Bridge for the to the Oxbow/Floodplain Fish Miller Ditch will be: <br />months of October - April is: Habitat Improvements will be <br /> limited to: <br />Qtotal > or equal to 90 cfs 1 0 cfs Qtotal-l0 cfs <br />Qtotal < than 89.9 cfs and>80 7.5 cfs Qtotal-7.5 cfs <br />cfs <br />Qtotal <or equal to 79.9 cfs 5 cfs for 4 out of 7 days Qtotal-5 cfs for 4 contiguous <br />and> 74 cfs days out of 7; Qtotal for 3 <br /> contiguous days out of 7. <br />Qtotal < 74 cfs no out-of-priority diversion for Qtotal <br /> oxbows <br /> <br />4 <br /> <br />. <br /> <br />. <br /> <br />. <br />