Laserfiche WebLink
<br />the Raw Water Booster Pump, including but not limited to depletions allowed under water rights <br />and augmentation plans decreed to the Authority as of the date of this MOA and resulting <br />augmentation requirements. If the Authority does not meet its obligations identified in this <br />MOA, then the CWCB will not consider such discharges to occur at or above the Raw Water <br />Booster Pump. <br /> <br />2. At times when the flow of the Eagle River immediately downstream of the Metcalf Ditch <br />Headgate is less than the current amounts decreed to the ISF as a result of diversions by the <br />Authority, the Authority shall, when physically possible, divert at the Raw Water Booster Pump <br />the water it would otherwise have diverted at the Metcalf Ditch Headgate. This provision is <br />limited to the physical capacity of the Raw Water Booster Pump and shall not in any manner be <br />construed as a subordination of any of the Authority's water rights to the ISF. In the event a <br />final, unappealable judgment is entered by any court finding that this MOA constitutes a <br />subordination of any of the Authority's water rights to the ISF, this MOA shall become null, void <br />and of no further force or effect. <br /> <br />3. Nothing in this MOA shall be construed as a subordination ofthe CWCB's ISF right to any <br />other water rights(s). In the event a final, unappealable judgment is entered by any court finding <br />that this MOA constitutes a subordination ofthe CWCB's ISF right to any other water right, this <br />MOA shall become null, void and of no further force or effect. In the event this MOA becomes <br />null and void because of a court finding that the MOA constitutes a subordination of a party's <br />water rights, then the parties shall cooperate in good faith to develop a substitute agreement that <br />accomplishes the mutual objectives of the MOA in a manner that does not constitute a <br />subordination. This MOA shall not prohibit or otherwise preclude the CWCB from participating <br />in any future water cases or enforcing the terms of this MOA or other decrees as long as such <br />participation is not inconsistent with the terms of this MOA. <br /> <br />4. The Authority agrees that it will not initiate any action that will result in the permanent <br />reduction of the capacity of the Raw Water Booster Pump. This MOA is also not intended to <br />affect the operation of the Edwards Drinking Water Facility Diversion or the Authority's other <br />diversion points. <br /> <br />5. The Authority and/or District shall maintain the improvements made by the Authority in <br />the Eagle River in connection with the construction of the Raw Water Booster Pump and shall <br />consult with the Colorado Division of Wildlife to ensure that said improvements fully achieve <br />the intended purpose of concentrating and directing flows to the north bank of the river at times <br />oflow flows to enhance fish passage and improve the flow of water into the Raw Water Booster <br />Pump. At a minimum, the Authority and/or District shall maintain said improvements to comply <br />with Special Condition #2 of the Dept. ofthe Army Permit No. 199575126 issued to the <br />Authority in connection with the construction of the Raw Water Booster Pump diversion <br />structure and the improvements described above, particularly the requirement that the depth of <br />the streambed along the shoreline be maintained to allow sufficient velocity to scour sediment. <br /> <br />6. The Authority and/or District shall provide the DOW with all plans and specifications for <br />the new Avon Plant outfall upon completions of such plans and specifications. <br /> <br />7. The parties shall provide a copy of this MOA to the Division Engineer for Water <br />Division 5 and request that the Division Engineer give the MOA full force and effect in <br />administering diversions at the Raw Water Booster Pump in relation to the ISF in accordance <br />with paragraph I above. In the event that the Division Engineer does not give the MOA full <br />force and effect, then any party may petition the District Court in and for Water Division No.5 <br />to issue an order to the Division Engineer to give the MOA full force and effect. <br /> <br />. <br /> <br />. <br /> <br />. <br />