My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00079 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00079 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:44:12 PM
Creation date
2/20/2007 11:04:51 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/14/2006
Description
OWCDP Section- Proposed Revisions to Guidelines for Financial Assistance to Covered Entities to Develop Water Conservation Plans
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />Adopted by the CWCR May 25, 2005 <br />Revised by the Board January 24, 2006 <br /> <br />. <br /> <br />The Office's efforts will inclide making ,:/at@r user and FFH:lRioipal aRd special district gr01:lpS <br />aware of the grant program, as \'/ell as professional groups, to stimulate demand and encourage <br />applications. <br /> <br />b) Re Appropriation of Funds <br />Demaad f{)r mORies ideRtified by the two pHases of graRt applicatieRs reoeives annually ".ill be <br />used to support a request for the unobligated balance of the five perceRt share of the operatioRal <br />accouRt of the Se"'eraRee TaJl Trust Fund in MarcH of each year by the Board. <br /> <br />e) Day to day Administration of the Grant Program <br />The Office and other Board staff, as necessary, ',vill hansle day to say ,^.dministration of the grant <br />program. ,^.dministration responsibilities of the Office and the CWCB will include: <br /> <br />i) ManagemeRt and accounting f-or the moneys iR the grant program; <br />ii) Disbursement aRd tracking of grant paymeRts to grantees, expenses, and allocations; <br />iii) Notification to sueeessful aRd I:lnsuccessful applicaRts of the disposition of their <br />applications; <br />iv) Review of progress aRd final project reports; <br />v) Fl:lnd compliaRce assuranee, iRcluding project termiRation if necessary; <br />vi) Project doseout for eaeh projeet induding, but not limited to, project filiRg, digitizing <br />aRd posting of tHe Final PlaR OR the Boars web site, final payment, aftd determination of <br />level of reimbursement, if appropriate; and <br />vii) Preparation ef an arumal report to the Boars regarding the graftt program. <br /> <br />(j. Other Considerations <br /> <br />. <br /> <br />a) Sehedule <br />No funded projeot '.vill b@ allowed to extend over more than ORe ealendar year from the date of <br />the grant award. If data eoll@ction aRd system eharacterizatioR activities are Reeded by the <br />J31aBlling entity to forward more effeetive 'Hater eORservation, theR tasks for tHese efforts 't'/ill <br />need to be iReorporated iRto tHe plaR for imJ3lemefltation. <br /> <br />b) Matehing Funds <br />Entities requesting funding under this J3rogram ,....ill need to Have and/or demonstrate the ability to <br />provide 25% of the plan development Bl:lsget with matCHing funds, either as caSH or in kind <br />services or through payment of eonsulting fees or any eomeination thereof. The Board will <br />consider applications with a reduced level of matching funds; however these applicants ,....ill need <br />to demonstrate financial hardship to be eligible for a Board waiver of the matehing fund <br />requirement. <br /> <br />e) Matehing Fund Reimbursement <br />If funds are available, the Board will reimbl:lrse the planning entity witH up to 50% of the <br />matching funds used on a single proj@ct if the planning entity utilizes the planning steps, or some <br />semblance thereof, as encouraged in the Water Conservation PlaR Development Guidanc@ <br />Doe1:lmeRt developed and promotes by the Office, iR preparation of the eRtity's Water <br />Conservation Plan, and the plan developed by the eRtity is reviewed and appro'led by the Offiee. <br /> <br />d) Payment The CWCB will make bet'.yeen 1 and 1 payments during the term of tHe project <br />from this graRt program to the planning eRtity that has been a'.varded funds, as requested by each <br />. applicant in its application. The individual payments do not need to be equal. All payments will <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.