My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00068 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00068 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:44:04 PM
Creation date
2/20/2007 11:04:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/13/2006
Description
CF Section - En-Bloc Non-Reimbursable Investments Recommendations - WSP Section - CWCB - Upper Arkansas River Basin - Decision Support System Feasibility Study
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />. <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Russell George <br />Executive Director <br /> <br />FROM: <br /> <br />Ray Alvarado <br />Water Supply Protection Section <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: <br /> <br />October 30, 2006 <br /> <br />SUBJECT: Agenda Item 11d, November 13- 15, 2006 Board Meeting - <br />CWCB - Upper Arkansas River Basin - Decision Support System Feasibility Study <br /> <br />. Introduction <br /> <br />This request is for doing a feasibility study for a Decision Support System (DSS) in the Arkansas River Basin. <br />As with other DSS feasibility studies, the Arkansas feasibility study is to define the purpose for, uses of, users, <br />components, data requirements, costs and schedule required to implement such a system. This study will be <br />done for the upper Arkansas River Basin, upstream of Pueblo Reservoir Dam. The results of the feasibility <br />study will be used by this agency and the Division of Water Resources for recommending the development of <br />an Arkansas decision support system (ARKDSS) for the upper Arkansas. For FY 07-08, an appropriation of <br />$200,000 is being sought from the Construction Fund. <br /> <br />Discussion <br /> <br />The general ARKDSS feasibility study objectives are to: <br />. Determine the feasibility of developing a DSS for the upper Arkansas similar to the systems <br />implemented in the Colorado, Rio Grande and South Platte River Basins, but taking into account the <br />basin specific needs and water resource challenges. <br />. Identify the scope, functions, and elements of the DSS, as well as the data needs, costs, and schedule to <br />develop the ARKDSS for the upper basin. <br /> <br />The feasibility study will encompass the upper Arkansas River drainage (Division 2), starting from the Pueblo <br />Reservoir dam to the headwaters, for hydrologic and administrative reasons. Due to years of compact litigation, <br />the lower part of the basin is data rich, with existing tools, analysis and understanding of the water resources. <br />. The upper basin does not have this same level of water resource data collection, analysis or understanding as in <br />the lower basin, downstream of Pueblo Reservoir. <br />
The URL can be used to link to this page
Your browser does not support the video tag.