My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00064 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00064 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:44:02 PM
Creation date
2/20/2007 11:04:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/13/2006
Description
CF Section - Construction Fund and Severance Tax Trust Fund Perpetual Base Account New Loans - Platte Valley Irrigation Company - New Equalizer Reservoir Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />ST A TE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Bruce Johnson, P.E. ~~< <br />Mike Serlet, P.E., Chief~ <br />Water Supply Planning an Inance Section <br /> <br />Russell George <br />Executive Director <br /> <br />FROM: <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: November 6, 2006 <br /> <br />SUBJECT: Agenda Item 10e, November 13-15, 2006 Board Meeting <br />Water Supply Planning and Finance Section - New Project Loans <br />Platte Valley Irrigation Company - New Equalizer Reservoir Project <br /> <br />Introduction <br /> <br />The Platte Valley Irrigation Company (PVIC) is applying for a $2,365,000 loan from the Severance <br />Tax Trust Fund Perpetual Base Account to construct an equalizer reservoir, the Platte Valley <br />Reservoir No.1, and to add additional measurement and control structures on their main ditch. <br />The estimated total cost of the project is $2,628,600. Please see the attached Project Data Sheet. <br /> <br />Backaround <br /> <br />The PVIC service area includes approximately 14,832 acres of irrigated farm land in Weld <br />County starting near Platteville and extending along the east side of State Highway 85 north and <br />east for approximately 15 miles. The land in the project service area is primarily private farms, <br />ranches, and some individual home sites. All of the agricultural land serviced by the PVIC is <br />privately owned, and the stock ownership is currently 100% agricultural. Crops grown in the <br />service area include corn, beets, grain including oats, wheat and barley, alfalfa hay, and <br />potatoes. <br /> <br />PVIC diverts water for irrigation from the South Platte River near Platteville. They share a <br />jointly-owned headgate with Farmers Reservoir and Irrigation Company (FRICO) located on the <br />east bank of the South Platte River in Sec.19, T2N, R66W. The two companies share the same <br />jointly-owned channel (the Platte Valley Canal) for approximately 10 miles to a bifurcation <br />structure. At that point, the Evans NO.2 Ditch, owned by PVIC, serves to deliver water to <br />irrigated lands under the ditch. The Evans NO.2 Ditch is about 15 miles long and terminates at <br />the inlet to Lake Christina, which is owned by FRICO. The Company has a part ownership in <br />Sand Hills Reservoir to store up to 400 acre-feet of Colorado-Big Thompson (CBT) water. They <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.