Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Water Project Construction Loan Program - Project Data <br /> <br />Borrower: Penrose Water District (PWD) <br />Water Activity Enterprise <br /> <br />County: Fremont <br /> <br />Project Name: Penrose Raw Water Acquisition <br />and Development Project <br /> <br />Project Type: Water Rights Purchase and <br />Raw Water Pipeline <br /> <br />Drainage Basin: Arkansas <br /> <br />Water Source: Arkansas - Pleasant Valley Ditch <br /> <br />Total Project Cost: $9,730,000 <br /> <br />Funding Sources: CWCS, PWD, DOLA <br /> <br />Type of Borrower: Municipal/Low <br /> <br />Aver. Delivery: 339 AF consumptive use <br /> <br />ewes Construction Fund Loan: $8,844,570 Interest Rate: 3.25% Term: 30 years <br />(incl. 1% loan fee) <br /> <br />The PWD currently provides domestic water to approximately 4,000 people with 1,700 taps in and <br />around the Town of Penrose, with existing demand of 489 acre-feet per year. PWO's water supply <br />is obtained by a lease with the Beaver Park Water, Inc. (BPW) who owns and operates Brush <br />Hollow Reservoir. The 1990 lease has a 3D-year term, and provides an increasing amount of water <br />each year, 751 AF in 2006, leveling out at 1,000 AF in 2020. In drought years, the amount <br />available to PWD is further reduced below the contract amount. Future build..out demand in 2040 is <br />projected to be 1,200 acre-feet for about 8,000 residents and 3,240 taps. The proposed Enterprise <br />project includes the acquisition of 10/12lh of the Pleasant Vatley Ditch water rights near Howard, <br />with a change in use and change in point of diversion approximately 50 miles downstream to Sec. <br />13, T19S, R69W. Water will be obtained through the installation of 7 shallow alluvial wells <br />immediately north of the Arkansas River, and then pumped approximately 5.8 miles through a 12- <br />inch transmission line to Brush Hollow Reservoir. As part of the project, Brush Hollow Reservoir will <br />be enlarged by raising the dam four feet. Because of the drought, there has been reduced <br />availability of water from BPW. The project and water rights purchase will supplement the existing <br />BPW lease, and lessen PWD's reliance on BPW leased water, particularly in drought situations. <br /> <br />,. <br /> <br />I J~ 'c~,\j ;;j~ I I <br />.F '(~ ' <br />--.J,--,~. I .1 <br />r .f 1.l~"'" ::-.WI"'~ <br /> <br />1'."'0'" m.,.. Ili'lri"-- .,-- ~~" L <br /> <br />~ ' <br /> <br />"" "., <br />"'.}. ."~" <br /> <br />OJ' r___ <br /> <br />.- <br />" ,,,, <br /> <br /> <br />EI <br /> <br />'" <br /> <br />~ <br /> <br /> <br /> <br />., <br />'. <br />. <br /> <br />FREMONT <br /> <br />~ <br /> <br />"'''''''' <br /> <br /> <br />. <br /> <br />l\A8fl ~ <br />AlIOfl(~l ., <br />\ .-;--~-,------_.~---" J,- <br />......... .J'_ . /PI' '4'..-. <br />,..,...... .. ~',l.'_. ~.... , ~ <br /> <br />Location Map <br />