My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00055 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00055 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:43:50 PM
Creation date
2/20/2007 11:04:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/13/2006
Description
IBCC Director's Report - Interbasin Compact Committee Annual Report to the House of Representatives Com. On Agriculture, Livestock, Natural Resources, and Senate Com. On Agriculture, Energy, Natural
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. Scope of Work <br /> <br />The application must provide a shmmary of the scope of work. The scope of work is a <br />detailed summary of how the projl~ct or water activity will be accomplished. The scope of <br />work must include a description of the activities and tasks that will be undertaken, logistics, <br />and final product/deliverables to b~ produced at the completion of the grant or loan activity. <br /> <br />Information that should be in the scope of work includes the following: <br /> <br />. Detailed summary of the water activity. <br />. Description of the goals of the water activity and how the water activity will <br />accomplish those goals. <br />. Description of how the work will be accomplished and major deliverables/products. <br />. A list of participants and thFir qualifications to accomplish the project/water activity. <br />· A detailed budget by activi,ty, level of effort, and rates. The budget shall also detail <br />the source and amount o(matching funds and/or in-kind contributions, if any. If <br />applicable, the budget sh~uld also include any other outstanding or previously <br />applied for funding that also supports the water activity. <br />I <br />. A detailed project schedule'including key milestones. <br />I <br /> <br />I <br />I <br />Water Supply Reserve Account <;::riteria and Guidelines - Adopted: October 18,2006 <br /> <br />12 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.