Laserfiche WebLink
<br />Section 2 <br />Reports From Basin Roundtables <br />--:,{jc~"Si~, . <br /> <br />The results of the gap analysis conducted during SWSI <br />for the Denver/South Metro Counties is presented in <br />Table 2-1. <br /> <br />Among the projects for which the Metro Basin <br />Roundtable is interested in seeking additional information <br />is the proposed Flaming Gorge Pipeline Project. This <br />proposed project will divert water from Flaming Gorge <br />Reservoir on the UtahlWyoming boarder and deliver the <br />water through 400 miles of pipeline to the Front Range. <br /> <br />2-10 <br /> <br />Table 2.1 Summary of Gap Analysis for the Denver/South <br />Metro Counties <br /> <br /> I Identified Gross <br /> Demand Shortfall <br />County (AFY) <br />Denver Metro 12,500 <br />South Metro 50,300 <br />TOTAL 62,800 <br /> <br />S:\IBC Support\Report to leglslature\Sectlon 2 flnal.doc <br />