My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00054 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00054 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:43:45 PM
Creation date
2/20/2007 11:04:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/13/2006
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Assenlons Claimed <br /> <br />Assenion Evidence is Uncenain <br /> <br />Assenion Evidence IS InsuffICient <br /> <br />Assenlon is Potentially Valid, Applicant <br />Prefers Easement <br /> <br />Region 2 Ditch Bill Application Processing Status <br />October 1, 2006 <br /> <br />Definitions <br />In addition to a Drtch Bill Easement Application, a ditch owner can also claim a right to use water transmission facitities dating back to before a National Forest e"sled <br /> <br />II is not clear whether an assenion claim is likely valid The claiment has been asked to provide additional evidence. <br /> <br />The assenion evidence is insuffICient to recognize the assenlon claim. The assenion evaluation process is closed and the Ditch Bill evaluation process continues <br /> <br />The assenion is likely valid, but the applICant prefers a Ditch Bill Easement The assenion analysis process is closed and the Ditch Bill evaluation process continues <br /> <br />Assenoon is Potentially Valid, Applicant The assenion is likely valid and is preferred over a Ditch Bill Easement The assertion is recognized in US Forest Service land status records and the Ditch Bill evaluation process is <br />Prefers Assenion suspended. <br /> <br />.lS" <br /> <br />Assenlon Relinquished Upon Easement Applicant assened a prior right to the water facility predating establishment of the National Forest or Grassland and upon signing the Ditch Bill easement all prevIOus assened rights were <br />Signing relinqUished. <br /> <br />Easement Application Suspended, <br />Assenion Recognized <br /> <br />Easemenl Application Withdrawn <br /> <br />Easement Application is Denied or <br />Wrthdrawn <br />Easement ApplICation is Uncenain <br /> <br />Easement Applicalion is Valid <br /> <br />Easement ApplicatIOn is Valid NEPA <br />Scoping Inrtiated <br /> <br />Easement Consolidated <br /> <br />Easement Prepared <br /> <br />Easement Issued <br /> <br />Ditch Bill Applications Processed <br /> <br />. <br /> <br />The assenion is likely valid and is preferred over a Ditch Bill Easement The assertion IS recognized in US Forest Service land status records and the Ditch Bill evaluation process is <br />suspended <br /> <br />ApplICant has voluntairty withdrawn the application in writing. The Ditch Application is closed. <br /> <br />Applicant does not meet one of 9 established criteria or the applicanl has voluntairty withdrawn the application in writing. The Ditch ApplICation is closed. <br /> <br />II is not clear whether a Ditch Bill Easement application meets all 9 criteria. The Ditch Bill Easement Applicant has been asked to provide additional evidence <br /> <br />A Ditch Bill Easement application meets all 9 criteria and will be issued. <br /> <br />After easement validity has been determined, National Environmental Policy Act (NEPA) scoping has begun to determine under whal conditions the application will be issued to meet Federal. <br />Stale, and Local law and policy. <br /> <br />Two ditchbill easement applications were submitted for the same water facility on two different Forests One apphcation for each Forest The Forest with the headgate or dam will process the <br />entire application <br /> <br />The easement NEPA document and easement have been completed and sent to the applicant for signature. <br /> <br />The NEPA process has been completed, all necessary signatures have been obtained, and a deed for the easement has been issued. <br /> <br />An assertion has been recognized and the Drtch Bill Application has been suspended. <br />A Ditch Bill ApplicatIOn has been withdrawn. <br />A Ditch Bill Apphcation has been denied. <br />A Ditch Bill Easement has been issued. <br />A Ditch Bill Easement has been consolidated. <br /> <br />'T <br /> <br />D~,.,.,,'" ",f,) <br />. ...~"'" -.....- <br /> <br />. <br /> <br />. <br /> <br />... <br />
The URL can be used to link to this page
Your browser does not support the video tag.