Laserfiche WebLink
<br />. <br /> <br />Agenda Item #19: Proposed revision to #1 <br /> <br />In the event the Authority and/or the District discharge the treated effluent from the Avon <br />Plant to a location in the Eagle River 25 feet or less downstream of the Raw Water <br />Booster Pump, such discharge up to 10 cfs (the current capacity of the Avon Plant) will <br />be considered to occur at or upstream of the Raw Water Booster Pump for purposes of <br />determining injury from diversions at the Raw Water Booster Pump under water rights <br />and augmentation plans decreed to the Authority and/or District as of the date of <br />this MOA to the ISF and resulting augmentation requirements. If the Authority does <br />not meet its obligations identified in this MOA, then the CWCB will not consider such <br />discharges to occur at or above the Raw Water Booster Pump. <br /> <br />. <br /> <br />. <br />