Laserfiche WebLink
<br /> <br />Analysis Condition 4 <br /> <br />, <br /> <br />t <br />~ <br />t i <br />.Ii I <br />~., <br /> <br />r,I,.,;". <br />\ <br />I <br /> <br />Ii <br />~ ' <br /> <br />f: <br />f <br />~ <br />J,rl <br />J <br /> <br />r' <br /> <br />l l <br /> <br />" <br /> <br />Water Demand: Peak water usage at 2 g.p.m. per tap plus new taps associated with Skaff <br />Subdivision and a new high school gymnasium and a 750 g.p.m. fire flow at the high <br />school (node # 1 09). <br /> <br />Distribution System: The existing water distribution system with the assumed addition of <br />Skaff Subdivision on east side of Town. Replacement of ::1:400 feet of 4 inch cast iron <br />pipe with 8" diameter pipe along Oak Street where shown on the enclosed Town map. <br />Repair ofthe pressure reducing valve (PRV) near the intersection of Ninth and Pine <br />Streets and installation of new PRVs northerly of the intersection of French Street and <br />Chico Drive and near the intersection of Ninth and Oak Streets would also be part of this <br />alternative. <br /> <br />Water Demand: Peak water usage at 2 g.p.m. per tap plus new taps associated with Skaff <br />Subdivision and a new high school gymnasium and a 750 g.p.m. fire flow at the high <br />school (node # 109). <br /> <br />I <br />I ; <br />t, : <br />I : <br /> <br />r <br />1 I <br /> <br />Analysis Condition 5 <br /> <br />I' <br /> <br /> <br />~r.'.:,...,1 <br />:1 <br />'~ ! <br />'; I <br />f." , <br />-4 I <br />If <br />I: ~ <br />; ~ <br /> <br />Distribution System: The existing water distribution system with the assumed addition of <br />Skaff Subdivision on east side of Town. Construction of a new 8 inch diameter pipeline <br />for 1,550 feet along Ninth Street where shown on the enclosed town map. Replacement <br />of some 2 inch diameter pipe along the east end of Ninth Street could be included. Repair <br />of the pressure reducing valve (PRV) near the intersection of Ninth and Pine Streets and <br />installation of a new PR V near the intersection of French Street and Ninth Streets would <br />also be part of this alternative. <br /> <br />Water Demand: Peak water usage at 2 g.p.m. per tap plus new taps associated with Skaff <br />Subdivision and a new high school gymnasium and a 750 g.p.m. fire flow at the high <br />school (node #109). <br /> <br />~ . <br />I <br />I <br />I <br />I <br />\ <br /> <br />D. Analysis Results <br /> <br />Output data from the pipe network computer program are included in Appendix B for each ofthe <br />analysis condition listed in the previous section. Calculated water system pressures are tabulated <br />in the output for each alternate. In most cases, comparison of water system pressures produced <br />from different alternatives, is the best indication of the adequacy of the water distribution system <br />used in the analysis. The map included in Appendix A displays the existing and proposed water <br />system and a numbering sequence used in the computer calculations. Numbers enclosed in <br />circles on the map designate the locations (node number) where pressures were calculated. <br />Numbers enclosed in a box on the map represent pipe numbers used in the computer program <br />data. <br /> <br />'t <br />! <br />,t <br />~ <br /> <br />:; <br /> <br />II <br /> <br />I <br />, <br />