Laserfiche WebLink
<br />. '" <br />. <br /> <br />~ <br />, r <br /> <br />ESTIMATED PROJECT COSTS <br /> <br />Professional services: <br /> <br />Design, construction, materials <br />@ $5.00/sq. ft. X 1,575 sq. ft. <br /> <br />$7,875.00 <br /> <br />Equipment: <br /> <br />Connect irrigation system to potable water tap: <br /> <br />800.00 <br /> <br />Total: <br /> <br />$8,675.00 <br /> <br />PROJECT BUDGET <br /> <br /> Grant Funds Other Funds Total <br /> (In-kind & donations) <br />Professional services $4,200.00 $3,675.00 $7,875.00 <br />(design, construction <br />& materials) <br />Irrigation equipment 800.00 800.00 <br />Grand Total $5,000.00 $3,675.00 $8,675.00 <br /> <br />The grant funds will be applied toward professional services to design and construct the garden, <br />including materials, and the cost of irrigation equipment. Out-of-pocket costs for professional <br />services will be reduced by the donation of compost for soil preparation from the City of Longmont, <br />and donations of plants and turf from the green industry. The school district will provide in-kind <br />labor to attach the irrigation system to the potable water system. Longs Peak students will also solicit <br />cash donations from the community. <br />