Laserfiche WebLink
<br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- - <br />. <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />Chatfield Reservoir <br /> <br /> UNIT EXTENDED <br />ITEM UNIT UNIT QTY COST COST NOTES <br />GnUs ITEM , $100.00 Group grill - remove, store and reinstall al future <br /> $100 locations <br /> CATEGORY SUBTOTAL '228,231 <br />Group Picnic Af'8112 75 penoon CllpeQty <br />Walls FF 630 $35.00 $22,050 135 LF. 56" heiwn: <br />Groun Shelters ALLOW 1 $10,000.00 $10,000 Dimensions of cenopieli approx. 18'x21' - 2 canopies <br />Gravel Pavement SF 3000 $0.75 $2,250 <br /> ITEM 6 $100.00 $800 Store and relocate picnic tables under relocated <br />Picnic Tablm; shettllni <br />Grills ITEM 1 $100.00 $100 Group grill - remOYll. store and reinstall .t future <br /> locabons <br /> CATEGORY SUBTOTAL $35,200 <br />FURNISHINGS <br /> EA 5 $100.00 $500 Store and relocate picnic tables under relocated <br />Picnic Tables Shllttlll'1i <br />Benches ITEM 1 $7500 $75 Store and relocate at future location <br />Water fountain ITEM 2 SODa $0 2 attached per restroom building, part of Restroom <br /> oost <br />Dumpsters ITEM 1 $100.00 S100 Store and reinstall at future locations <br />Trash Recept8Cles ITEM , $50.00 $50 Store and reinstall at future locations <br />Grills ITEM 5 $75.00 $375 Store and reinstall at future locations <br />Regulatory SiW1s ALLOW , $0.00 $0 Cost eccounted for in demolition division <br /> CATEGORY SUBTOTAL $1100 <br />UnLlnES <br />Waterline LF 250 $7.50 $1,875 1 M diameter water distribution line <br />Sanitary S~er lllteralLine LF 250 $12.00 $3,000 4" diameter s~er lateral <br />Sanitary Sewer Manhole EA 2 $3,500.00 $7,000 <br />Water Hydrants EA J $1,500.00 $4.500 Frost Free Hydrant Indud.1Il conn.eton to local <br /> i inrl and trenCl1inn com <br />LiftStBtion ITEM 1 $000 $0 n01 a1'I'ected <br />Storm Water Inlets EA 1 $3,500.00 $3,500 Storm Water inlet indudes new piping and trenching <br />Storm Water Oil Separator Inlets EA , $10,000.00 $10,000 Storm Wat"r inlet for oil separation indudes new <br /> i ino and trenCl1ino <br />Storm Water Pipe LF 500 $2400 $12,000 Storm Water pipe. 12" diameter <br />CATEGORY SUBTOTAL $41.175 <br />ELECTRICAL and TElECOMMUNICAnONS <br />Electnc Distribution Line LF 250 $15.00 $3,750 Underground electric distribullon in conduit <br />Telephone LF 0 $2,500.00 $0 Underground telephone wire in conduit <br />Transformers EA , $2,500.00 $2,500 75 KVA <br />Light poles ITEM 0 $0.00 $0 Cost accounted for in demolition division <br />CATEGORY SUBTOTAL $1260 <br />LANDSCAPE <br />Seeding Dryland Gresses SF 130000 $0.10 $13.000 Allowance. Drilled 5eeding di5turbed 8/'eas <br />Straw Mulch SF 130000 $0.05 $6,500 Crimped over seeded areas <br />......dro Mulch SF 0 $0.05 $0 SariN" mulCl1 over seeded areilli <br />Deciduous Trees EA 50 $300.00 $15,000 Allowance. 2.5. Calioer <br />Ever reen Trees EA 25 $320.00 $6.000 Allowance 6' Averaoe Hei ht <br />Shrub5 EA 100 $20.00 $2,000 Allowance 5 Gallon Shrubs <br />CATEGORY SUBTOTAL 5"600 <br />IRRlGAnON <br />Point of Connection EA , $2,000.00 $2,000 Conneeton to water main, vacuum breaker, <br />Spray Irrigation SF 0 $1.00 $0 Large Radius Pop Up Heads <br />Bubbler lrrination Per Plant 175 $75.00 $13,125 Bubbler at Trees and Shrubs <br />CATEGORY SUBTOTAL 11I11U <br /> <br />Concept Plan Coli Eslimlle <br /> <br />Page 130125 <br /> <br />.. <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- ,- <br />e, <br /> <br />- <br /> <br />- <br /> <br />I <br /> <br />Recreation Mitigation Study <br /> <br /> UNIT EXTENDED <br />ITEM UNIT UNIT QTY COST COST NOTES <br />SUBTOTAL $1122317 <br />CONTRACTORS GENERAL CONDlnONS '2% $74,11711 <br />CONCEPT PLAN CONTINGENCY 2$"," $155578 <br />GRAND TOTAL $852,574 <br />fQX RUN - -,. <br /> - .. <br />DEMOLITION <br />Clear and Grub SF 43580 $0.05 $2,178 StriD 5118 and remove rasse5 and shrubs <br />Remove Gravel ar1l:in area SF 31000 $0.15 $4650 <br />Remove Exisbna Concrete trails SF 2000 $0.75 $1500 <br />Remove Existing shelter 5tructures, store, ALLOW , $10,000.00 $10,000 <br />demolish walls <br />Remove horae &how boards and store EA 4 $200.00 $800 <br />Remove voll ball court om and store EA 2 $200.00 $400 <br /> CATEGORY SUBTOTAL $18.521 <br />EARTHWORK <br />Bulk Embankment CY 0 $2.00 $0 cut = 7500 CY <br />Excavation and Hauling CY 7000 $3.00 $21,000 Includes excavation and 1 mile haul to construction <br /> ... <br />Topsoil. Strip. Stockpile and Spread CY 750 $4.00 $3,000 =:~e& ~~:~e::~v~~:\:~:d ea:~:~ <br />Fine Gradin SF 40000 $0.05 $2 000 Assumes all aved and landscaoe areas <br /> CATEGORY SUBTOTAL 128,000 <br />ROADS AND PARKING <br />Asphalt SF 20500 $150 $30,750 <br />Striping ALLOW , $1,00000 $1,000 <br />Curtlandgutler LF 0 $8.00 $0 <br /> CATEGORY SUBTOTAL 131 750 <br />TRAilS <br />Concrete Trails SF 6500 $3.00 $25,500 <br /> CATEGORY SUBTOTAL $2& 500 <br />STRUCTURES <br />Portable Restrooms EA 2 $100.00 $200 Relocate to future location <br />Group Picnic Area 75 pel'$On capacrly <br />Walls FF 630 $35.00 522,050 135 LF. 56"h <br />Reinstall GrouD Shelters AllOW 1 $10,000.00 $10,000 Dlmen&ions of canopies appro....16'x21. ea." <br /> cano ies <br />Gravel Pavement SF 3450 $0.75 $2.588 <br />Picnic Tables ITEM '0 $100.00 $1,000 Store end relocate picnic tables under relocated <br /> Iihettera <br />Grills ITEM 1 $100.00 $100 Group grill - remove, store and reinstall at future <br /> locations <br /> CATEGORY SUBTOTAL U5,i31 <br />FURNISHINGS <br />Dumpsters ITEM 1 $100.00 $100 Store and reinstall at future locations <br />Trash Receptacles ITEM 2 $50.00 $'00 Store and reinstall at future locations <br />Regulatory SiW1s AllOW 1 $200 00 $200 Remove and relocate to flJture location <br />Fencing LF 716 $10.00 $7,160 Remove and relocate to fubJre location <br /> CATEGORY SUBTOTAL S75&O <br />RECREATIONAL FACIUTIES <br />Beach Volleyball Court ITEM 1 $5,000.00 $5,000 Includes new sand, reinstalled posts. <br />HOl"5e Shoe Pits ITEM 2 $500.00 $1,000 <br /> CATEGORY SUBTOTAL SI 000 <br /> <br />Concept Plan Cost Estimate <br /> <br />Page 140f25 <br /> <br />EDAW February 2004 <br /> <br />Page 37 <br />