Laserfiche WebLink
<br />- <br /> <br />- - <br />. <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />Chatfield Reservoir <br /> <br />- <br />. <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- - <br />. <br /> <br />I <br /> <br />- <br /> <br />- <br /> <br />Recreation Mitigation Study <br /> <br />4, The unit quantities are both take-offs of existing features from the concept plans as well as assumptions <br />based on similar project experience, The assumptions are noted in the notes column of the cost estimate, <br />5, The unit costs are based on current cost estimate data collected from similar types of projects bid in the <br />past few years as well as published cost data information for some project elements, The unit costs are, <br />in our opinion, average construction costs for this type and quantity of project, based in 2003 - 2004, The <br />cost estimate does not include an escalation factor for development in the future, <br />6, The cost estimate does not include overall project development or overhead costs that may be accrued if <br />the project is developed in multiple phases, <br />7, The following contingencies are uti lized in the cost estimate: <br />a, Contractors General Conditions, This is a percentage of total construction costs and includes <br />the contractor's costs that are defined in the Division One of the Project specifications and are <br />not generally included in the unit costs, The unit costs included in the estimate do include some <br />Division One items including profit and overhead, General conditions include: Administrative <br />Requirements (Permits, Bonds, Insurance, Scheduling, Submittals); Quality Requirements <br />(Testing, Sampling); Temporary Facilities (Utilities, Trailers, Scaffolding, Tarpaulins, Barricades, <br />Fences, Signs); Equipment Rental; Cleaning; Commissioning (As-Builts, Punch lists, Training <br />O&M Manuals), The percentage for General Conditions can range from 4 to 20%, depending on <br />the size, location and complexity and other variables of the project and estimate, The percentage <br />utilized in the Concept Plan Cost Estimate falls in the middle of this range, <br />b, Concept Design Contingency, This is a percentage of total construction costs and is included to <br />cover the many details of the project that are not yet planned, designed or know at this time, The <br />plans are conceptual at this time; the cost estimate includes many assumptions and professional <br />opinions, Design contingencies for a Class C estimate usually range from 15 to 30%, <br />8, The cost estimate includes a percentage allowance for design services, including design contingencies and <br />Contractors General Conditions and include: <br />a, Design Allowance, This is an allowance for the anticipated phases of dcsign that will be required <br />for this project. The allowance includes the following design phases: <br />i, Pre-Design, This phase of design takes the project through the masterplan and may include: <br />project programming, design data collection, development of alternatives, value analysis <br />of alternatives, pre-design summary document, design development and Class B cost <br />estimate, <br />ii, Special (Supplementary) Services, This can include: funding for archeology, <br />constructability review, value analysis, final cost estimating, geo-technical surveys, <br />historic structure reports, hazardous materials studies, visual simulation, visitor experience <br />planning, geographic infonnation system, graphics, topographical surveys, public meetings, <br />etc, <br />iii, Final Design, This is the final phase of Design, completing the design development <br />started in pre-design through the completion of approved construction documents for bid <br />negotiations <br />b, Construction Phase Services, This is a percentage of total construction costs, including Design <br />Contingencies and General Conditions, and may include construction support services competed <br />and/or contracted by the Owner, such as construction management, construction administration, <br />materials and construction testing, surveying, compliance and monitoring services, etc, <br />c, Owners Construction Phase Contingency. This is a percentage of total construction costs, including <br />Design Contingencies and General Conditions, and is an allowance to cover potential changes to <br />the final construction cost from unforeseen conditions, change orders and design changes, <br />9, Compliance and/or mitigation costs are not included, <br />10, Tree removal costs are not included, <br /> <br />II, Utilities, The costs included for utilities are assumptions only as detailed utility plans were not <br />available, <br />12, Grading costs assume excavation material will be excavated from the project site, <br /> <br />CHATFIELD RESERVOIR RECREATION MITIGATION STUDY EDAW, Inc. <br />CONCEPT PLAN COST ESTIMATE Februarv 2, 2004 <br />I <br />PLAN AREA TOTAL COST <br />North Ramp $1,322,789 <br />Massey Draw $528,979 <br />Eagle Cove $79,169 <br />Park Entrance Station - Deer Creek $258,887 <br />Deer Creek - Day Use $452,381 <br />Deer Creek - Balloon Staging Area $296,628 <br />Swim Beach $2,292,618 <br />Jamison I $426,823 <br />Catfish Area 1 &2 $622,317 <br />Fox Run I $244,526 <br />Kingfisher Area $72,267 <br />Gravel Ponds Area $77,302 <br />Platte River $62,012 <br />Marina Point $929,013 <br />South Ramp Including Marina $4,278,057 <br />Roxborough Cove $54,490 <br />Plum Creek $239,422 <br />Overall Trails $538,978 <br />Roads and Bridges $4,167,650 <br />Reallocation Subtotal $16,944,306 <br />I <br />Cost Estimate Allowances <br />Contractors General Conditions 12% $2,033,317 <br />Concept Design Contingency 25% $4,236,077 <br />Grand Total Allowances $6,269,393 <br />Reallocation Total $23,213,699 <br />Design Services Allowance <br />Design Allowance (Pre-Design, Special Services, 17% $3,946,329 <br />Final Design) <br />Construction Phase Services 8% $1,857,096 <br />Owners Construction Phase Contingency 6% $1,392,822 <br />Grand Total Design Services Allowances $7,196,247 <br />Reallocation Grand Total $30,409,946 <br /> <br />Table 4,2 - Cost Estimate Summary , <br /> <br />EDAW February 2004 <br /> <br />Page 29 <br />