My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10313
CWCB
>
Floodplain Documents
>
Backfile
>
9001-10000
>
FLOOD10313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:49 AM
Creation date
2/7/2007 11:10:45 AM
Metadata
Fields
Template:
Floodplain Documents
County
Montezuma
Community
Dolores
Stream Name
Dolores River
Basin
San Juan/Dolores
Title
Dolores River Field Report
Date
11/1/2001
Prepared For
Dolores
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Staff Conclusions <br />The CWCB staff appreciates the concerns that have been expressed by interested parties, <br />residents and county officials regarding the floodplain questions in the Dolores River <br />valley. To 'address these questions, the CWCB has performed a technical review and <br />offers the following conclusions: <br /> <br />1, The CWCB staff finds that the lOa-year floodplain information as presented in <br />the U.S. Army Corps of Engineers (Corps) and Federal Emergency Management <br />Agency (FEMA) reports to be reasonable and representative of the 100- <br />floodplain for the Dolores River. The Colorado Water Conservation Board <br />approved Resolution FPR 00-525 dated September 25,2000 which designates the <br />information in said reports as the 100- year floodplain for the Dolores River, The <br />CWCB does not recommend that a new floodplain study be conducted for the <br />subject reach of the Dolores River, <br /> <br />2, The CWCB staff recommends that a flood mitigation plan be prepared as part of <br />the reclamation plan for the gravel operations. The flood mitigati,on plan should <br />address the existing and post-mining areas of the floodplain; the location, type, <br />and size of any temporary or permanent levee systems; the location and quantity <br />of material stockpiles; any temporary or permanent flood protection measures; <br />and the county floodplain regulation requirements, <br /> <br />3. The CWCB was not requested to discuss or review any of the information that <br />may have been presented during the Colorado Mined Land Reclamation Board <br />hearings, Therefore, this technical review only addresses the floodplain issues <br />related to the gravel mining sites in question, The CWCB will not address topics <br />such as water quality, fish and wildlife habitat, sedimentation, and aesthetics, <br />
The URL can be used to link to this page
Your browser does not support the video tag.