My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150152 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
C150152 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:57:55 AM
Creation date
2/6/2007 2:50:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150152
Contractor Name
New Castle, Town of
Contract Type
Loan
Water District
39
County
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />Credit worthiness: The Town of New Castle Utility Fund has existing debt as <br />follows: <br /> <br />Remaining <br />Lender Name & Address Amount <br /> <br />Annual <br />Payment <br /> <br />Maturity <br />Date <br /> <br />Colorado Water Resources & Power Development Authority <br />Logan Tower Building, Suite 620 <br /> <br />1580 Logan Street <br /> <br />Denver, CO 80203 <br /> <br />$418,426.89 <br /> <br />$36,199.96 5/1/2019 <br /> <br />Colorado Department of Local Affairs <br /> <br />1313 Sherman Street, Room 521 <br /> <br />Denver, CO 80203 <br /> <br />$17,261.48 <br /> <br />$9,283.31 <br /> <br />9/1/2004 <br /> <br />Alternative financing considerations: <br /> <br />The Town of New Castle has investigated alternative financing sources. The Town <br />has obtained an in-kind grant from the Colorado River Water Conservation District <br />for engineering design. The Town of New Castle has obtained a grant of $200,000 <br />from the Colorado Department of Health SEP program to assist with a portion of <br />the construction costs. Long-term financing for the Town's portion of the <br />construction costs could not be financed internally with a one-time assessment. <br /> <br />Collateral: <br />As security for the loan the Town of New Castle will pledge enterprise fund <br />revenues (Utility Fund) backed by a rate covenant and annual fmancial reporting. <br />This is in compliance with CWCB Loan Policy #5 (Collateral). <br /> <br />14 <br /> <br />CFlA902 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.