My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150152 Contract
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
C150152 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:57:55 AM
Creation date
2/6/2007 2:44:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150152
Contractor Name
New Castle, Town of
Contract Type
Loan
Water District
39
County
Garfield
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the eWCB staff, or, if required by ~ 37-87-105, C.R.S., <br />the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such <br />bills are due. <br />M. PROJECT-related expenses incurred prior to the Effective Date of this contract in <br />accordance with the legislative approval of this loan. <br />SECTION 8 - ELIGIBLE EXPENSES. The following items are eligible for loan <br />disbursements. <br />A. Preparing final designs and specifications for the PROJECT. <br />B. Preparing bid and construction contract documents. <br />, C. Preparing environmental, assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Pqlicy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWeB and the, BORROWER. <br />G. Engineering services for construction management, including design and <br />construction management for eWCB-approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br />Contract. ' <br />I. Legal Services for reviewing engineering services contracts, reviewing this <br />Contract, reviewing construction cbntractdocuments, and for complying With all <br />federal, state, and local regulatory requirements. ' <br />SECTION 9 - DISBURSEMENT SCHEDULE <br />The BORROWER shall prepare a periodic progress report which contains a statement <br />of the PROJECT costs expended for that period and shall forward said statement to <br />the CWCB. After receipt of the periodic progress report from the BORROWER, and <br />review and acceptance of the items therein as eligible expenses as described below, <br />the CWeB will pay to the BORROWER the amount set forth in the report or such <br />portion that has been approved by the eWCB. Such payment shall be made within <br />thirty (30) days from the CWCB's approval of each progress report. <br />SECTION 10 - TIME FOR PERFORMANCE <br />PROJECT Beginning: Upon Effective Date of this Contract (the date this contract is <br />signed by the State Controller or his designee). <br />PROJECT Finish: Two (2) years from the Effective Date of this Contract <br /> <br />Page 30f3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.