My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150152 Contract
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
C150152 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:57:55 AM
Creation date
2/6/2007 2:44:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150152
Contractor Name
New Castle, Town of
Contract Type
Loan
Water District
39
County
Garfield
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROJECT SUMMARY - TOWN OF NEW CASTLE - CONTRACT No. C150152 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: Town of New Castle acting by and through the Town of <br />New Castle Water and Sewer Enterprise <br />Address: P. O. Box 90, New Castle, CO 81647 <br />Federal Identification No.: 84-6000700 <br />Contact: Steve Rippy, Town Administrator <br />Phone Number: 970-984-2311 Fax Number: 970-984-2716 <br />, E-mail address: steve@newcastlecolorado.org <br />Type of Entity: The Town of New Castle is a home rule town pursuant to ~ 31- <br />1-203, C;R.S. (1986), located in Garfield County in the State of <br />Colorado. The BORROWER is an enterprise within the meaning <br />, of ~37-45.1-101 et sec., C.R.S. and Article X, Section 20 of the <br />Colorado Constitution, and was established the Town's Board of <br />Trustees by Ordinance No. 463 dated December 26, 1995, <br />incorporated herein by reference. <br />Section 2 - Project Description <br />Description of PROJECT: The BORROWER applied to the CWCB for a loan to be used <br />for the construction of a new diversion structure and pump station on the Colorado <br />River, and a raw. water pipeline to its existing water treatment facility, located in <br />Garfield County, hereinafter referred to as the PROJECT, at an estimated total cost of <br />$1,006,900. <br />Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on the PROJECT entitled "Loan Feasibility of Construction of the New Castle Colorado <br />River Raw Water Transmission System," dated August 2003, which is incorporated <br />herein by reference, and, based upon the feasibility report, the CWeB determined the <br />PROJECT to be technically and financially feasible. <br />SECTION 3 - eWCB's AUTHORITY <br />Small Proiect Loan: This loan is made pursuant to the provisions of ~~ 37-60-119 <br />and 37-60-120, C.R.S., which authorizes the ewcs to loan money for water projects <br />for the benefit of the people of the State, provided that the borrower assures <br />repayment of that money. <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCS to make loans of up to <br />$5,000,000 from the CWCS's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly . <br />SECTION 4 - BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br />At its September 2003 meeting, the CWCB approved a Small Project Loan from the <br />Construction Fund to the BORROWER in an amount up to $700,000 for PROJECT costs plus <br />$7,000 for the 1 % loan service charge for a total loan amount of $707,000, with repayment <br /> <br />Appendix 1 to Loan Contract C150152 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.