Laserfiche WebLink
<br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br /> <br />eRS 24-30-202 requires that the State Controller approve all state contracts. This contract is not <br />valid until the State Controller, or such assistant as he may delegate, has signed it The <br />contractor is not authorized to begin performance until the contract is signed and dated below. If <br />performance begins prior to the date below, the State of Colorado may not be obligated to pay <br />for the goods and/or services provided. <br /> <br /> <br />B <br />Effective Date 9 c;;.d--O '--~ <br /> <br />Page 5 of5 <br />