My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01773
CWCB
>
Loan Projects
>
Backfile
>
3001-3102
>
PROJC01773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2011 10:16:06 AM
Creation date
2/6/2007 2:28:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150178
Contractor Name
Hillrose, Town of
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Contract Documents
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />insurance. <br /> <br />15. Additional Contract Requirements. Any additional contract requirements are set <br />forth in Additional Contract Requirement (Section 6) of the Project Summary. <br /> <br />B. PROJECT PROVISIONS <br /> <br />1. Construction Fund Program Procedures. During the completion of the PROJECT, the <br />BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br />(Section 7) of the Project Summary. <br /> <br />2. Eligible Expenses. The PROJECT expenses for which the BORROWER is eligible for <br />loan disbursements are listed in Eligible Expenses (Section 8) of the Project <br />Summary. <br /> <br />3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br />Disbursement Schedule (Section 9) of the Project Summary. <br /> <br />4. Time for Performance. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BORROWER shall <br />complete the PROJECT within the time specified in Time for Performance (Section 1 O) of <br />the Project Summary. <br /> <br />5. Indemnification By The Construction Firm. The BORROWER shall require all <br />Construction Firms and their subcontractors to indemnify the STATE and the BORROWER <br />against all liability and loss. and against all claims and actions based upon or arising <br />out of damage or injury. including death. to persons or property, caused by any acts or <br />omissions of those parties or sustained in connection with the performance of any <br />contract related to the PROJECT or by conditions created thereby, or based upon any <br />violation of any statute. ordinance. or regulation, and the defense of any such claims or <br />actions. <br /> <br />6. Liability Insurance During Construction. During construction of the PROJECT, the <br />BORROWER shall require the construction firm(s} and any subcontractors to maintain the <br />following insurance coverage in the limits shown during the term of their contracts for <br />the construction of the PROJECT. The BORROWER shall provide the CWCB with an <br />Acord Form 27 evidencing said insurance prior to commencement of construction. <br />maintained until construction is complete. and shall provide the CWCB with <br />documentation of renewals of said insurance. No payments shall be made to the <br />BORROWER unless all insurance certificates are current. <br /> <br />a. Builder's risk insurance for construction in progress for all perils of loss including fire, <br />wind. hail, and vandalism in an amount equal to the completed value of the <br />PROJECT. <br /> <br />b. Worker's compensation and employer's liability insurance in the required statutory <br />amounts. <br /> <br />c. Automobile liability insurance that includes coverage for all owned, non-owned and <br />hired vehicles with minimum limits of $1.000.000 combined single limit for bodily <br />injury and property damage. <br /> <br />Page 6 of 10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.