Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />The Town would p1lTcha~e ) Share~ of Jackson Re~ervoir and )5 ~hare ofRiver~ide Re~rvoir to <br /> <br />provide additional anementation water for the exi~ng Town Sy~em The Town currently <br /> <br />~erve~ 11) tap~ with 11 additional potential tap~ of plattf'.cI lot~ and exi~ng re~idence~ and <br /> <br />commercial propertie~ not cnrrently u~ing Town water <br /> <br />Water Right: _2.22 CFS. <br /> <br />Average water diverted per year: 53.23. acre-feet before water <br /> <br />restrictions. And 2653. Acre Feet after water restrictions. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES X NO <br /> <br />If YES, please explain. Tt would he heneficial to the Town to p1lTcha~e additional water rieht~ <br />at some point in the fiJture for om exi~ne ~~em Purcha~ine additional ~hares of the <br />T .ower Platte and Reaver r.anal r.o would al~o he wi~e to Vlin a e;reater ~hare of their <br />anementation credit~ <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br />NAME ADDRESS and PHONE <br /> <br /> <br />Shannon Saramaa <br /> <br />IDS Hyciro r.on~nltant~ Tnc 545 Ea~ Pike!': Pf'.ak Ave, <br />r.olorndo Spring!':, r.O R0901 <br />r.arl McGuire ill, Attorney PO Rox 916, Fort Mot:Vln, r.O R0701 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. Rrent Nation with Nation Rngjnf'.ering Serv1c.e!': T.T.r. ha!': hfo.en hirf'n to complete a <br />fea!':ihility ~rrudy <br /> <br />3 <br /> <br />CFlA902 <br /> <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: $ 7' 019 0 <br />Estimated Construction Costs: $7(),?SA AA <br /> <br />$ 111 1.- So <br /> <br />~~. ,i'~QI,~ <br />