Laserfiche WebLink
<br />UJIG55 <br /> <br />References <br /> <br />Appendix <br /> <br />A. Outlet Works Discharge Curves (Drawing No. 711-D-447) <br /> <br />B. Hydraulic Loss Computations <br />1. Main outlet works (Table 2 - Technical Record) <br />2. Auxiliary outlet works (Table 3 - Technical Record) <br />3. Power plant <br /> <br />C. Operation of Auxiliary Outlet Works - Memorandum Dated September 26, 1979 <br /> <br />D. Procedure for Verification Testing of Hydraulic Cylinders (5/13/98) <br /> <br />E. Information for Test Plan and Schedule <br /> <br />List of Figures <br /> <br />1. Expected Performance Curves of Vertical Francis Turbine <br /> <br />2. Spillway Discharge and Tailwater Curves (from Drawing No. 711-D-38) <br /> <br />List of Tables <br /> <br />1. Hydraulic Characteristics at Various Locations, Main Outlet Works <br /> <br />2. Navajo Reservoir Elevations - May and June <br /> <br />3. Discharge Capacities for May-June, Navajo Reservoir (in fi3/s) <br /> <br />4. Summary of Discharge Capacities - Navajo Dam <br />