My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12453
CWCB
>
Water Supply Protection
>
Backfile
>
20000-20849
>
WSPC12453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:15:19 PM
Creation date
1/25/2007 2:59:07 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.102.01.A
Description
Water Projects - Aspinall Storage Unit - General - Project Description
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/2000
Author
DOI-BOR
Title
Wayne N Aspinall Unit - Blue Mesa-Morrow Point-Crystal Dams-Reservoirs - Briefing on Reservoir Operations and Related Issues - 07-01-00
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.): "1 (-\ '':;1 9 <br />,.) ...... u 11 '. <br /> <br />National Environmental Policy Act and Section 7 Consultation <br /> <br />Many of the studies underway throughout the basin will support Reclamation's completion of <br />draft and final environmental impact statements on operational changes for the Unit. As defined, <br />the proposed action is to implement a reasonable and prudent alternative to avoid jeopardy to <br />endangered fish from Aspinall Unit operations via long-term reservoir operation criteria. Row <br />recommendations are expected from the Fish and Wildlife Service in late 2000 and completion of <br />an environmental impact statement is scheduled for 2002. <br /> <br />Initial public scoping activities and periodic public meetings throughout the 1990's have <br />continued to show a very strong public sentiment that the benefits of the Aspinall Unit (fish and <br />wildlife, recreation, hydropower, water supply, flood control) should be continued under new <br />operation criteria. <br /> <br />Concluding Remarks <br /> <br />The Aspinall Unit and its operation have become a significant factor in western Colorado from <br />an economic, recreational, and fish and wildlife standpoint, as well as its hydropower and water <br />storage purposes. In addition to the authorized project purposes, Unit operation is being <br />reviewed in light of compliance with the Endangered Species Act and the quantification of the <br />National Park's reserved water right. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.