Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />e <br /> <br />'. " ...s' <br />J....~_u 'J <br /> <br />Plant Purpose: <br />Generation of hydroelectric power for use in the project. <br /> <br />Plant History: <br />Transformer KRA was replaced in fiscal year 1996. <br /> <br />Present Activities: <br />Repairing outlet tube No.2. <br /> <br />Future Planned Activities: <br />Replace station service transformer in fiscal year 1999. Possible rewind in 200l. <br /> <br />River: <br />Gunnison River <br /> <br />Plant Type: <br />Conventional <br /> <br />Powerhouse Type: <br />Above Ground <br /> <br />Turbine Type: <br />Francis <br /> <br />Original Nameplate Capacity: I <br />28,000 kW <br /> <br />Installed Capacity:/' <br />28,000 kW <br /> <br />Year of Initial Operation: <br />1978 <br /> <br />Age: <br />23 years <br /> <br />Net Generation: <br />(FY 2000) <br />182,026,166 kWh <br /> <br />Rated Head: <br />207 feet <br /> <br />Annual Plant Factor: <br />(FY 2000) <br />76.2 percent <br />