Laserfiche WebLink
<br />j <br /> <br />. <br /> <br />STATE ct COLORADO <br />-. <br />'., <br />c" ~ <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866.4474 <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Execl,ltive Director, DNR <br /> <br />DariesC. Lite, P.E. <br />Director, ewes <br /> <br />January 9,1997 <br /> <br />Mr. Gene Aiello, President <br />Purgatoire River Water Conservancy District <br />314 W. Main Street <br />Trinidad, CO 81082 <br /> <br />Re: Construction Fund Loan Application <br /> <br />Dear Mr. Aiello: <br /> <br />At the November 1996 meeting of the Colorado Water Conservation Board, the Board was <br />unable to consider a request for refinancing of the Trinidad Project by the Purgatoire River Water <br />Conservancy District since an application hag not been received prior to the November meeting. <br />Subsequently, the Construction Fund bill was introduced, in the General Assembly without a <br />request for the Trinidad Project refinancing. <br /> <br />We have, however, tentatively placed this item on the agenda for consideration by the Board at <br />the January 1997 Board meeting. All funding requests for the January meeting will be presented <br />to the Board by the CWCB staff after a thorough review of the application and the feasibility of <br />each proposed project by the staff. <br /> <br />Please be advised that as of today we have not received a signed application from the Purgatoire <br />River Water Conservancy District for a Construction Fund loan for refinancing of the Trinidad <br />Project nor any of the information requested in Bill Green's letters to you of October 28, 1996 <br />and November 29, 1996. <br /> <br />Our staff analysis and memorandum to the Board on this funding request must be mailed no later <br />than January 21 for consideration at the January 29 and 30 Board meeting. We will need a <br />minimum of one week to prepare this memorandum to the Board and to send a draft of the <br />memorandum to you for your review. <br /> <br />/// <br />