Laserfiche WebLink
<br />- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Ray McAnelly will spend 1.0 month of time doing this task. In addition since the model <br />must be run twice daily (seed and no-seed) we require doubling the capacity of our PC <br />cluster. Therefore, we have budgeted for the purchase of additional PC processors. <br /> <br />Scope of Task #5: Perform evaluations <br /> <br />This task involves evaluating model performance. First this involves implementing <br />updated code for Multivariate Randomized Block Permutation (MRBP) analysis. Then it <br />involves collecting and assembling observed precipitation at selected sites. Finally it <br />involves processing those data and computing a monthly mean. Ray McAnelly will spend <br />1.0 month of his time on that task. Gustavo Carrio will perform MRBP analyses of model <br />output data to evaluate model performance in forecasting an identified month at selected <br />sites that are expected to be free from seeding operations and those expected to be within <br />the coverage of seeded plumes. This will require 1.5 months of his time. Dr. Paul <br />Mielke will devote 0.25 month to provide us with an updated MRBP code and advice and <br />assistance on the use of the MRBP analysis approach. <br /> <br />Scope of Task #6: Research study supervision and reporting <br /> <br />Dr. Bill Cotton will serve as Principal Investigator for the research study proposed, and <br />supervisor of the CSU Team's activities. Dr. Cotton will see that proposed tasks are <br />performed on schedule, assist in the preparation of draft quarterly and final reports, and <br />see that the project stays within budget. We budget 0.75 month for this task. He will be <br />assisted by Brenda Thompson who will compile and edit drafts of the three quarterly and <br />final reports. She will monitor all project expenditures and provide Dr. Cotton <br />evaluations of expenditures. She will also oversee the procurement of research materials. <br />She will also assist in computer system administration including troubleshooting system <br />malfunctions. A total of 1.0 month of her time is budgeted for these operating costs. <br /> <br />3.2 Project Work Provided as part of the 50-50 Cost Sharing <br /> <br />Colorado Water Conservation Board <br /> <br />Mr. Joe Busto will be the project manager for the proposed WDMP Grant and will be the <br />point of contact between the CWCB and Reclamation. He will participate in the required <br />midterm project review and the ending presentation on the overall progress of the project <br />(solicitation section B.2.3). The CWCB will also be responsible for he overall <br />administration ofthe WDMP Grant funds and the proposed project, including work <br />involved with billings to Reclamation and billings from CSU for their work on the <br />research study. The final drafts of all required reports (technical and financial) will be <br />prepared and printed by the CWCB, and then submitted to Reclamation. Total time for <br />CWCB staff working on the project is estimated at about 1.5 months. All CWCB labor <br />and WDMP Grant administrative costs will be covered by the CWCB as part of the 50-50 <br />cost sharing requirement. <br /> <br />11-18 <br />