My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00204 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00204 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:12:17 AM
Creation date
1/17/2007 11:05:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150026
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 99-173
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />SUMMARY OF PROPOSED PROJECT <br />UTE WATER CONSERVANCY DISTRICT <br />PLATEAU CREEK PIPELINE PROJECT <br /> <br />Proiect Sponsor: Ute Water Conservancy District <br /> <br />Tvpe of Proiect: Municipal water supply - pipeline replacement <br /> <br />Location: About ten miles east of Grand Junction in Mesa County (see attached map) <br /> <br />Date of Application: May 22, 1998 <br /> <br />PlanniDl~ Studies Completed: <br /> <br />Feasibility Study, Plateau Creek Pipeline, Western Engineers, October 1987; <br /> <br />Feasibility Study Amendment Reportfor Plateau Creek Pipeline, Steffen Robertson & Kirsten, <br />February 1991; <br /> <br />Replacement of the Plateau Creek Pipeline, Project Management Plan, Camp Dresser & Mckee <br />Inc. and others, June 1995; <br /> <br />. Ute Water Service Area, Domestic Water Demand Projections, Pearse & Associates, July 1995; <br /> <br />Plateau Creek Pipeline Replacement Project, Final Environmental Impact Statement, prepared <br />for the Bureau of Land Management, prepared by Camp Dresser & Mckee Inc. and others, <br />February 1998. <br /> <br />Proiect Description: The District is proposing to replace its existing Plateau Creek Pipeline with <br />a new line from Jerry Creek Reservoirs to the Ute Water Treatment Plant near Palisade as shown <br />on the attached map. The preliminary design includes 11:3 miles of 48-inch diameter pipe and <br />4.1 miles of 54-inch diameter pipe. There are a total of 13 creek crossings and a new, 3,250-foot <br />long tunnel near the confluence of Plateau Creek and the Colorado River. Additional tunnel <br />options are presently under consideration. The project is currently under design by Camp Dresser <br />& Mckee. The first phase of construction is scheduled to begin in February 1999 and completion <br />is expected to take two years. <br /> <br />Total Estimated Cost: $35,255,000 <br /> <br />Existinl!: Authorization: SB-30 in 1988 for $8.0 million of which about $1.6 million has been <br />disbursed leaving a remaining balance of about $6.4 million for design and construction <br /> <br />Reauested Additional Fundiol!:: $9.60 million <br /> <br />. <br />