My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00204 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00204 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:12:17 AM
Creation date
1/17/2007 11:05:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150026
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 99-173
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />ST ATE ~ COLORADO <br /> <br />#&~ <br /> <br /> <br />. <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phon~: (03) 866.34..;] <br />FAXe (303) 366-+174 <br /> <br />MEMORANDUl <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E.Walcher <br />Executive Director <br /> <br />DATE: <br /> <br />Colorado Water Conservation Board Members <br />/,'")~ter H. Evans <br />/ ~ ewes Director <br />Bill Green, P.E., Water Supply Planning and Finance Section <br />Mike Serlet, P.E., c~rer Supply Planning and Finance Sectiofian McAuliffe <br />. Deputy Duector <br /> <br />January 18, 2000 <br /> <br />TO: <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Agenda Item 11 C., January 26-27, 2000 Board Meeting - Water <br />Supply Planning and Finance - Changes in Existing Loans - Ute <br />Water Conservancy District - Plateau Creek Pipeline <br /> <br />Introduction <br /> <br />. <br /> <br />The Ute Water Conservancy District of Grand Junction (District), acting by and through <br />the Ute Water Activity Enterprise, is requesting an additional $10.0 million in funding for <br />the District's Plateau Creek Pipeline Replacement Project. The District has two existing <br />authorizations for this project totaling $17.6 million. Please see the attached Project <br />Summary and map and a letter from Larry Clever, the General Manager of the District. <br /> <br />Backl!round <br /> <br />The initial feasibility study for the project was completed in October of 1987 at which <br />time the cost was estimated at about $16.7 million. The preliminary project design and <br />$16.7 million cost estimate were presented to the Board in December of 1987. The Board <br />recommended a loan of$8.0 million from the Construction Fund for about 50 percent of <br />total project costs, as subsequently authorized in SB 88-30. <br /> <br />Since 1987, a nwnber of studies and permitting documents have been completed for this <br />project as listed on the attached Project Summary Sheet. All required permits have been <br />. obtained including the Bureau of Land Management Right-of- Way Permit, the Corps of <br />Engineers 404 Permit and Section 7 Consultation with the U.S. Fish and Wildlife Service. <br /> <br />. <br /> <br />At the November 1998 Board meeting, the Board recommended an additional increm,nt <br />of $9.60 million for the project as subsequently authorized in an amendment to SB 88-30 <br />and in SB 99-173. At that time, the cost of the project was estimated at $35.2 million. <br />The $9.6 million increase was intended to continue to provide 50 percent CWCB funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.