My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153719 Application
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153719 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:31:51 AM
Creation date
1/15/2007 1:18:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153719
Contractor Name
Johnstown, Town of
Contract Type
Loan
Water District
13
County
Larimer
Weld
Bill Number
SB 94-029
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. Fl <br /> <br />"'~ <br /> <br />CWCB Construction lad Loan Application <br />Revised June 16, 1993 <br /> <br />. <br /> <br />4. Is the organization incorporated in the State of Colorado? YES ~ NO_ <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with <br />this application form,) N/A <br /> <br />5, Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. (Attach separate sheets and <br />a map, if needed.): <br /> <br />See accompanying report <br /> <br />Raw Water Pipeline Feasibility Study <br /> <br />6, <br /> <br />For existing facilities indicate: <br /> <br />(a) the number of shareholders N/A , or <br /> <br /> <br />(b) the number of customers served 2000 , (Approx.) <br /> <br />Part B. - Description of the Project <br /> <br />1, Name of the project or facility: Pump Station and Raw Water Pipeline from <br />Lonetree Reservoir <br /> <br />2. What is the purpose of this loan application? Check one, <br /> <br />_ New project <br />~ Rehabilitation or replacement of existing faeili~y Facilities (Reservoir Cleaning, Misc.) <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />~ Other (describe) New Raw water Pipeline to replace current open ditch <br /> <br />3, If the project is for rehabilitation of an existing reservoir, is the reservoir currently under <br />a storage restriction order from the State Engineer? YES NO x <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.