My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Firestone_WCPlan_Applic
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Firestone_WCPlan_Applic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:34:04 AM
Creation date
1/15/2007 9:22:57 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 07-22
Applicant
Town of Firestone
Project Name
Town of Firestone Water Conservation Plan
Title
Grant application for Water Conservation Planning
Date
9/5/2006
County
Weld
Water Efficiency - Doc Type
Application
Document Relationships
FirestoneWCPFinal2007
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> Town staff and Consultant will collectively review all conservation measures and <br /> programs that passed the screening criteria and group them, so similar <br /> measures and associated water-savings are not double counted. <br />6.2 Estimate costs and water saving of conservation options <br /> Using Worksheet 6-1 as a guide, Town staff and Clear Water Solutions, Inc. will <br /> estimate the cost of each conservation measure/program and the associated <br /> water savings. A benefit/cost analysis will be included. <br />6.3 Compare benefits and costs <br /> Town staff and Clear Water Solutions, Inc. will summarize conservation measure <br /> costs and water savings, including a net benefit from all suggested measures <br /> using Worksheets 6-1 and 6-2. TST will assist in quantifying net benefit of the <br /> measures. <br />6.4 Define evaluation criteria <br /> Town staff, with assistance from Consultant, will develop criteria used to select <br /> the conservation measures/programs for implementation. Key will be cost for <br /> implementation and potential savings. <br />6.5 Select conservation measures and programs <br /> Clear Water Solutions, Inc. will summarize the evaluation of each <br /> measure/program based on the evaluation criteria and indicate, with Town staff <br /> input, which measures/programs will be implemented. The water savings from <br /> the implementation will be estimated using Worksheet 6-3 as a guide. <br />Step 7 -Integrate Resources and Modify Forecasts <br />Purpose <br />The activities described under this task will modify the supply and demand forecasts to <br />account for water savings from conservation measures and programs. The benefits of <br />conservation as well as revenue effects will also be addressed. <br />Approach <br />7.1 Revise demand forecast <br /> Clear Water Solutions, Inc. will revise the demand forecast prepared in Step 2 to <br /> account for the water savings of the measures/programs from Step 6. <br /> Worksheet 7-1 will be used as a guide. <br />7.2 Identify project-specific savings <br /> This will not be completed as part of this plan. <br />7.3 Revise supply-capacity forecast <br /> This will not be completed as part of this plan. <br />7.4 Summarize forecast modifications and benefits of conservation <br /> Clear Water Solutions, Inc. will develop a graph showing demand and supply <br /> with and without conservation. <br />7.5 Consider revenue effects <br /> Consultant with Town staff will quantify impacts to revenues from <br /> implementation of water conservation. Savings in capital improvement projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.