My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150004 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150004 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2010 3:43:19 PM
Creation date
1/11/2007 4:03:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150004
Contractor Name
Fort Morgan, City of & Fort Morgan Water Works and Distribution Enterprise
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
HB98-1189
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SUMMARY OF PROPOSED PROJECT <br />CITY OF FORT MORGAN WATER SUPPLY PROJECT <br /> <br />Proiect Sponsor: City of Fort Morgan <br /> <br />Type of Proiect: Municipal water supply - pipeline and raw water reservoir <br /> <br />Location: From the vicinity of Platteville to near Fort Morgan (see attached map) <br /> <br />Date of Application: July 6,1994 <br /> <br />Feasibility Studies: Gronning Engineering, May 1995, and Montgomery Watson, <br />January 1997. <br /> <br />Proiect Description: The project involves the completion of the raw water facilities for <br />the City's water system replacement project. This will consist of 42 miles of 22-inch or <br />24-inch diameter pipeline and a terminal raw water reservoir with a capacity of 132 acre- <br />feet. The project is a part of the Southern Water Supply Project (SWSP) of the Northern <br />Colorado Water Conservancy District. <br /> <br />Estimated Proiect Yield: 3,360 acre-feet per year <br /> <br />Estimated Cost: $15.1 million for remaining raw water facilities <br /> <br />Loan ReQuested: $8.0 million <br /> <br />Previous Authorization: $5.5 million in SB 94-29 <br /> <br />SWSP Pipeline Construction <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.