My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00484 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00484 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:45 AM
Creation date
1/11/2007 11:35:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153788
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
FSL
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" - - - <br /> <br />. <br /> <br />FROM: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Bill Green, P,E,~ <<" <br />Projecl Planning and Construction Section <br /> <br /> <br />STA1'E O~OLORADO <br /> <br />- <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building . <br />13 13 Shennan Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: 13031866,4474 <br /> <br />Roy Romer <br />QNcnlQl <br /> <br />TO: <br /> <br />JAmes S. LochheAd <br />Executive Direl1or. DNR <br /> <br />DAdE'S C. Ule. PE. <br />Dirt'Ctor. (WeB <br /> <br />DATE: January 24, 1997 <br /> <br />SUBJECT: Agenda Item 9.a., January 29-30, 1997 Board Meeting - Water Project <br />Construction Loan Program - New Feasibility Study Loan Applications - <br />Greeley and Loveland Irrigation Co. - Reservoir and Canal Rehab. <br /> <br />INTRODUCTION <br /> <br />The Greeley and Loveland Irrigation Company of Greeley is applying for a Construction Fund <br />loan and a .small Dam Site grant to finance part of the costs of a feasibility study for the <br />. rehabilitation of the Company's water storage and distribution system, <br /> <br />BACKGROUND <br /> <br />The Greeley and Loveland Irrigation Company, along with the Seven Lakes Reservoir Company, <br />owns and operates an extensive system of reservoirs and canals for the irrigation of approximately <br />18,000 acres of agricultural lands in Larimer and Weld counties, (please see the attached map for <br />reservoir localions,) There are a total of 225 shareholders in the two companies, The two <br />companies have decreed direct flow and storage rights on the Big Thompson River for totals of <br />456 cfs and 66,700 acre-feet respectively. <br /> <br />The State Engineer's Office has identified a number of problems with seven of the dams operated <br />by the lwo companies and is requiring the owners to address those problems in the next few years. <br />In addition, the Greeley and Loveland Company is concerned with the condition and operational <br />capacity of at least two of its major canals and would like to investigate the hydraulic capacity of <br />its ent'tre system, <br /> <br />DISCUSSION <br /> <br />In December 1996, the Greeley and Loveland Irrigation Company retained ECI of Englewood to <br />prepare a plan of study for a detailed system evaluation and feasibility study to be conducted in <br />accordance with the CWCB Construction Fund Guidelines, The objective of the study is to select <br />. a financially sound alternative to rehabilitate the companies' irrigation systems to enable them to <br />
The URL can be used to link to this page
Your browser does not support the video tag.