|
<br />Appropriated but Unencumbered as of 6/30/92
<br />
<br />Clark Lake
<br />Clinton Reservoir
<br />Colorado River Dist. (Muddy Creek)
<br />Conejos Water Cons.
<br />City of craig
<br />Dam Inventory
<br />Dolores Water Cons
<br />Erie
<br />Florida Farms
<br />Ft. Morgan Res. & Irr.
<br />Great Western Dam
<br />Greeley - Peterson
<br />Greeley - Hourglass
<br />Greeley - Twin Lakes
<br />Jackson Reservoir (Mancos)
<br />Lemon Dam
<br />Lone Cone Reservoir
<br />Louisville Res.
<br />Moonlight Lateral
<br />Oak Creek (Sheriff Res.)
<br />Redlands Rehab.
<br />Ridge.s Metro
<br />Rio Grande (Ditches)
<br />San Miguel - Phase 2
<br />Stagecoach Res.
<br />ute Water Cons. Dist.
<br />Water Rights study
<br />White River
<br />Water Cons. Grants
<br />North Poudre
<br />Trinchera Irrigation
<br />pine River Irrigation Co.
<br />Town of Ignacio
<br />Sanchez Reservoir
<br />
<br />72,058.00
<br />8,400,000.00
<br />20,000,000.00
<br />450,000.00
<br />750,000.00
<br />80,000.00
<br />5,607,740.00
<br />1,050,000.00
<br />260,000.00
<br />50,000.00
<br />4,600,000.00
<br />3J30,000.00
<br />250,000.00
<br />412,000.00
<br />43,638.00
<br />162,900.00
<br />1,012,500.00
<br />1,690,000.00
<br />100,000.00
<br />300,000.00
<br />400,000.00
<br />922,109.00
<br />250,000.00
<br />7,500,000.00
<br />100,000.00
<br />7,937,500.00
<br />250,000.00
<br />30,000.00
<br />500,000.00
<br />1,800,000.00
<br />1,000,000.00
<br />190,000.00
<br />180,000.00
<br />400,000.00
<br />
<br />67,130,445.00
<br />
|