My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00143
CWCB
>
Publications
>
Backfile
>
PUB00143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
1/10/2007 9:39:54 AM
Metadata
Fields
Template:
Publications
Year
1992
Title
Construction Fund Annual Report 1992
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1992
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />Mesa Linda Subdivision Irrigation System <br />January, 1993 <br /> <br />Introduction <br /> <br />In 1982 the Mesa Linda Subdivision Property Owners Association, Inc. <br />(MLSPOA), a non-profit corporation, was formed by 14 property owners who own 80 <br />acres of rural land about 10 miles south of Durango. Fifty of these 80 acres are <br />irrigated and produce permanent pasture, orchards and gardens for the 14 owners. <br />The MLSPOA has applied for a $35,000 loan from the CWCB to install a pressurized <br />water pipeline for irrigation purposes. <br /> <br />Problem <br /> <br />The water for the present 50 acres under irrigation is supplied by open ditches <br />which have relatively high in maintenance costs due to the steep terrain (approximate <br />fall of 125 feet in one-half mile) and low in delivery efficiency. <br /> <br />Proposed Project <br /> <br />The Soil Conservation Service (SCS), Durango office, has designed a <br />recommended pipeline system to provide water for the 50 acres currently irrigated by <br />the MLSPOA. With this pipeline system the MLSPOA would be able to irrigate the <br />50 acres with its current appropriated water rights. The estimated cost of the <br />recommended project is $35,000. <br /> <br />Proposed Financing <br /> <br />The MLSPOA has applied for a $35,000 loan but in an accompanying letter it <br />has offered to cash fund 5-10% of the required amount and it is agreeable to pledge <br />the water pipeline system as well as its appropriated water rights as security for this <br />loan. The following funding is proposed: <br /> <br />MLSPOA (cash contribution) <br />CWCB (10 year, 5% loan) <br /> <br />$ 3,000 <br />32,000 <br />$35,000 <br /> <br />Under the above financial arrangement the MLSPOA would have to pay the <br />CWCB $4,144 per year for 10 years for a total repayment of $41,440. <br />
The URL can be used to link to this page
Your browser does not support the video tag.