My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153726 Application
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153726 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:30:42 AM
Creation date
12/19/2006 9:23:23 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153726
Contractor Name
Tremont Mutual Ditch Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
SPL
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Constroction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. Is the organization incorporated in the State of Colorado? YES XX NO <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with <br />this application form.) See Appendix A <br /> <br />5. Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. (Attach separate sheets and <br />a map, if needed.): <br />See Report Attached <br /> <br />6. <br /> <br />For existing facilities indicate: <br /> <br />(a) the number of shareholders 1<; ,or <br />(b) the number of customers served N/ A . <br /> <br />Part B. - Description of the Project <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1. Name of the project orfacility: Tremont South Platte River Diversion & Canal <br /> <br />2. What is the purpose of this loan application? Check one. <br /> <br />_ New project <br />L Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. If the project is for rehabilitation ofan existing reservoir, is the reservoir currently under <br />a storage restriction order from the State Engineer? YES NONil <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.