Laserfiche WebLink
<br />!i <br /> <br />Mr, Fred Walker, President <br />Tunnel Water Company <br />February 5, 2001 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB Desiqn and Construction Administration Procedures, <br />The project is currently underway. Tim Feehan will continue to make construction <br />inspections, which will be the basis of the monthly pay estimates for disbursement of <br />your loan funds, <br /> <br />d) You must adhere to the CWCB Guidelines for Financial Assistance, A copy of our <br />Guidelines has been sent to you previously, <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund <br />Loan from the Colorado Water Conservation Board, <br /> <br />Sincerely, <br /> <br />~~JJ <br /> <br />Mike Serlet, P,E" Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />Updated Memo: TunnelWaterCo101memo <br /> <br />Cc: <br /> <br />Mr. Eric WilKinson, Board Member, Colorado Water Conservation Boa-rd <br />Don Deere PE, Rocky Mountain Consultants, 825 Delaware Ave. Suite 500, Longmont, CO 80501 <br />CWCS Section S Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />c: wp51lProj-NewlTunnelWalerCo10111r <br />