My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150024 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150024 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:09:14 AM
Creation date
12/18/2006 11:32:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150024
Contractor Name
Sterling Irrigation Company
Contract Type
Loan
Water District
64
County
Logan
Bill Number
SB 99-173
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />STATE ct COLOMDO <br /> <br />~ <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1 31 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (3031 866-3441 <br />FAX: 13031 866-4474 <br /> <br />December 18, 1998 <br /> <br />Rov Romer <br />Co~'ernor <br />J.lnll:'5 S. Lochhead <br />Executive Diredor, DNR <br />DilriesC Lile, PE. <br />Director, (Well <br />PeterH. Ev;ms <br />Acting Director, eWeB <br /> <br />Mr. Kenneth Gareis, President <br />Sterling Irrigation Company <br />Drawer 1825 <br />Sterling, CO 80751 <br /> <br />Dear Mr. Gareis, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB), at their <br />November 1998 meeting in Denver, unanimously decided to recommend your application for a <br />loan from the CWCB Construction Fund to the General Assembly for approval. Your loan request <br />will be included in the Board's annual Water Project Construction Bill. We understand the loan <br />win be used to rehabilitate the diversion and headgate structures of the Sterling No.1 Ditch. <br /> <br />The Board recommended a loan from the Construction Fund in a maximum amount of$318,583, or <br />90-percent of the total project cost, whichever is less. The financing terms for this loan shan be at <br />an annual percentage rate of3.75-percent for a duration of30-years. Eligible costs include, but are <br />not limited to, engineering design and construction. Collateral for the loan shall be a security <br />interest in the stream of income derived from assessments, and a certificate of deposit in the amount <br />of one annual loan payment. <br /> <br />The Board recommended your loan with the following conditions: <br /> <br />a. The feasibilitv studv must be approved. The revised feasibility study report prepared by <br />Jack Oder, P.E., of GAS.P., originany dated August 1998 and received November 4. <br />1998, has been reviewed by Bin Green of my staff and found to be in compliance with <br />the "Guidelines for Financial Assistance from the CWCB Construction Fund." <br /> <br />b. An approved contract must be in place before funds can be advanced. Jan Illian will <br />contact you and your attorney concerning our contracting procedure. We understand <br />you plan to use the funds as soon as they become available on or about July I, 1999 <br />after the Bin has been signed by the Governor. We have a heavy contracting workload, <br />so to meet this deadline we will assign your project a high priority. We win also need <br />to communicate frequently. <br />
The URL can be used to link to this page
Your browser does not support the video tag.