Laserfiche WebLink
<br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />Mr. Bud Eylar, President <br />River Oaks on the Roaring Fork POA <br />December 19, 1996 <br /> <br />2 <br /> <br />d. A contract must be completed before funds can be advanced on vour loan. You will <br />be working with Jan Illian during the contracting process, which usually takes 3 to <br />6 months to complete. Jan will assist you with sample property owners resolutions, <br />and other documents necessary as part of the contracting process. <br /> <br />e. You must adhere to the CWCB Design and Construction Administration Procedures <br />Mike Serlet will work with you on the CWCB requirements concerning design and <br />bidding of the construction project. During the construction process he will make <br />field inspections, which will be the basis of the monthly pay estimates for <br />disbursements of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br />from the Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />/tI~?~ <br /> <br />William P. Stanton, P .E. <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />JVS:jvs <br /> <br />Attachment: <br />Updated Memo 12g. nav <br /> <br />cc (w/Attachment): <br />Mr. R. Eric Kuhn, Board Member ewes <br /> <br />cc (w/o Attachments): <br />eWeB Section B Staff <br />Linda Bassi, AGO <br /> <br />C:\WP51VOHN\ 12jNov96.ltr <br />