My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00310 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00310 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:54 AM
Creation date
12/8/2006 1:22:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153740
Contractor Name
Idaho Springs, City of
Contract Type
Loan
Water District
7
County
Clear Creek
Bill Number
EIA
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. .. ~ . <br /> <br />Agenda Item 18j. <br />November 7, 1995 <br /> <br />4 <br /> <br />Action Taken bv the CWCB. November 7.1995 <br /> <br />The CWCB approved the Staff Recommendation with an interest rate of 4.75% for <br />the Emergency Loan, and an interest rate of 5.25% for the Construction Fund <br />Authorization. The CWCB also found that the Emergency Loan approval was <br />necessary to avoid unreasonable risk of injury or damage to human health or well- <br />being, and that the emergency condition is not the result of negligence in the <br />operation or maintenance of the infrastructure. <br /> <br />The CWCB also required that a description of the loan collateral be presented to the <br />CWCB at the January 1996 meeting for discussion and approval, as appropriate. <br /> <br />AllaChments <br />C:\wpSl \PROJ.NEw\18j.nov <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.