Laserfiche WebLink
<br />., <br /> <br />. <br /> <br />. <br /> <br />Mr, Donald V, Johns, President <br />Horse Creek Water Users Association <br />February 7, 1997 <br /> <br />2 <br /> <br />c, The Feasibility Studv must be completed, John Van Sciver will review your draft <br />feasibility study, John will assist you with revisions to the study so that it complies <br />with the Guidelines and statutory requirements, <br /> <br />d, A contract must be completed before funds can be advanced on vour loan/ You will <br />be working with Jan Illian during the contracting process, which usually takes 3 to <br />6 months to complete, Jan will assist you with sample association member <br />resolutions, and other documents necessary as part of the contracting process, <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br />from the Colorado Water Conservation Board, <br /> <br />Sincerely, <br /> <br />f;I~ ?&cuvI~ <br /> <br />William p, Stanton, P,E, <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />JVS:jvs <br /> <br />Attachment: <br />Updated Memo 8g.Jan <br /> <br />cc (with Attachment): <br />Mr. Alan C. Hamel, Boardmember eWeB <br />Mr. William A. Hillhouse, 1801 CaliFornia St, Suite 3600, Denver CO 80202-2636 <br />Mr. Jody Grantham, State Engineer's Office <br /> <br />cc (no Attachment): <br />eWeB Section B Staff <br />Linda Bassi, AGO <br /> <br />C:\WP5IVOHN\8gJan97.ltr <br />