My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00378 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00378 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:48:30 PM
Creation date
12/7/2006 4:20:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153790
Contractor Name
Durkee Ditch Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />/ <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone, (3031 866-3441 <br />FAX, 13031866-4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />December 18, 1996 <br /> <br />Roy Romer <br />Governor <br /> <br />Jilmes s. Lochhe<ld <br />Executive Director, DNR <br /> <br />DilriesC. Lile, PE. <br />Director, ewes <br /> <br />Mr. Jim Hulteen, Secretary <br />Durkee Ditch Company <br />Box 41 <br />Eckert, CO 81418 <br /> <br />RE: Rehabilitation of the Durkee Ditch <br />Loan Recommendation <br /> <br />Dear Mr. Hulteen, <br /> <br />Concerning your application for a loan from the Construction Fund, I am pleased to inform you <br />the Colorado Water Conservation Board (CWCB) has decided to recommend your request for <br />$120,000 to the General Assembly for consideration in the annual Construction Fund Bill. It is <br />our understanding these funds will be used to rehabilitate the Durkee Ditch. <br /> <br />The CWCB approved a loan term of 30 years at an interest rate of 3.75%. I have attached a <br />copy of the updated Board memo concerning the Durkee Ditch Company. Please refer to page <br />2 of that memo and to the section "Action Taken by the CWCB, November 25,1996". <br /> <br />When the Board recommends your loan request to be included in the Construction Fund Bill, <br />there remain several conditions: <br /> <br />a. The bill must be approved by the General Assemblv and signed by the Governor. <br />This is usually accomplished around June 1st. <br /> <br />b. You must adhere to the CWCB Guidelines for Financial Assistance. A copy of our <br />guidelines has been provided to you. <br /> <br />c. The Feasibility Study must be completed. John Van Sciver will review your draft <br />feasibility study. John will assist you with revisions to the study so that it complies <br />with the Guidelines and statutory requirements. <br /> <br />. <br />.oIIIIl <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.