My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00141 App Ltr
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00141 App Ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2010 10:41:02 AM
Creation date
11/22/2006 10:55:53 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150135
Contractor Name
Silt Water Conservancy District
Contract Type
Loan
Water District
0
County
Garfield
Bill Number
MC3
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Silt Water Conservancy District <br />July 28-29, 2003 <br /> <br />Agenda Item 21d. <br />(Updated August 4,2003) <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Silt Water Conservancy District <br /> <br />County: Garfield <br /> <br />Project Name: Infrastructure Replacement <br /> <br />Project Type: Rehabilitation <br /> <br />Drainage Basin: <br /> <br />Colorado River <br /> <br />Water Source: Colorado River, Rifle Creek <br /> <br />Total Project Cost: $1,133,000 <br /> <br />Funding Sources: eWCB and District <br /> <br />Type of Borrower: Agricultural <br /> <br />Median Household Income: N/A <br /> <br />CWCB Loan: $1,019,700 <br /> <br />Interest Rate: 2.5% Term: 30 years <br /> <br />CWCB Grant: . 8;6,800 tV/A .1 , I Average water diverted per Year: 18,000 acre-feet <br />...7Wv /Y/12/(}'3 <br /> <br />The Silt Water Conservancy District, located in Garfield County, operates Silt Project facilities for the <br />benefit of the District landowners/shareholders by providing direct flow and storage of irrigation water <br />for 6,591 acres of agricultural land. The Silt Project infrastructure includes reservoirs, canals, pump <br />plants, and irrigation laterals varying in age from 50 to 100 years old, and in need of rehabilitation. <br />This project involves rehabilitation work on the Grass Vailey Canal, the Harvey Gap Dam, the Rifle <br />Gap Dam, and the Colorado River Pump Plant. The District delivers approximately 18,000 acre-feet <br />per year. The District has completed the feasibility study. Proposed funding for the project consists of <br />a $1,019,700 Smail Project Loan BRd a $6,8Q9 feasiBility 8tl:ley Cisl'lt from the ewcs, and the <br />remainder from the District. ..:::rwll 8/lz/o3 <br /> <br /> <br />/ <br /> <br />'..- /." <br />i <br />-." <br /> <br />" <br /> <br />. i <br />- ~ <br />'......., / ". <br /> <br />r '" <br />1 . <br /> <br />~,. " <br /> <br />r' ~ <br /> <br />" <br /> <br />, <br /> <br />-. <br /> <br />ifl <br /> <br />.1\ . <br />. '0'" <br />~~ 1~~'" <br />N Other Irrigation. Ditches <br />N Project & Fie Ditches . <br />_Irrigated Lands. . <br /> <br />()1234MUes <br />~ <br /> <br />J\l:nettlC!& <br /> <br />Location Map <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.