My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00141 App Ltr
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00141 App Ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2010 10:41:02 AM
Creation date
11/22/2006 10:55:53 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150135
Contractor Name
Silt Water Conservancy District
Contract Type
Loan
Water District
0
County
Garfield
Bill Number
MC3
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />^, <br /> <br />,~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />BillOweI\S <br />Governor <br /> <br />August 5, 2003 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />eWeB Director <br /> <br />Dan McAuliffe <br />Deputv Director <br /> <br />Mr. Norman Hunt, President <br />Silt Water Conservancy District <br />P.O. Box 8 <br />Silt, CO 81652 <br /> <br />RE: Rehabilitation of System Infrastructure <br />Loan Approval <br /> <br />Dear Mr. Hunt, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />approved your request for a Small Project Loan from the Construction Fund. We <br />understand the loan will be used to rehabilitate system infrastructure. <br /> <br />The Board approved a loan from the Construction Fund in an amount of $1,019,700 at <br />the loan terms of 2.5% for 30 years. The approval includes the provision for a 1 % loan <br />service charge, which may be paid at substantial completion of the project, or financed <br />along with the loan. I have attached a copy of the updated Board memo conceming the <br />Silt Water Conservancy District Please refer to page 4 of that memo and to the section <br />"Action taken by the CWCB July 28, 2003." <br /> <br />When the Board approves a Small Project Loan from the Construction Fund there remain <br />several conditions: <br /> <br />a) A Fea~ibility Stllrly mll~t be mmplAterl We have reviewed the study titled <br />Feasibility of Infrastructure Upgrade and Replacement. The report meets the <br />requirements of the CWCS Construction Fund Guidelines for feasibility studies, <br />and has been accepted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.