My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01422 App Ltr
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01422 App Ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2011 2:37:07 PM
Creation date
11/22/2006 10:53:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150133
Contractor Name
Low Line Ditch Company, The
Contract Type
Loan
Water District
64
County
Logan
Bill Number
MC3
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />G~50133 <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />March 28, 2003 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Steve Kaiser, Secretary <br />Low Line Ditch Company <br />P.Q, Box 1111 <br />Sterling, CO 80751 <br /> <br />Dan McAuliffe <br />Re: Well Augmentation / Diversion Structure Deputy Director <br />Approval of Loan Increase <br /> <br />Dear Steve, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />approved your request to increase the amount of your existing Small Project Loan. The <br />added funding is for rehabilitation. of your Company's diversion structure on the South <br />Platte River. <br /> <br />The Board approved an increase of $65,250, so that your new total loan amount is <br />$159,750, The loan terms are 2.50% for 20 years, The approval includes the provision for <br />a 1 % ($1,597.50) loan service charge, which may be paid at closing, or financed along <br />with the loan, I have attached a copy of the updated Board memo concerning Low Line <br />Ditch Company. Please refer to page 4 of that memo and to the section "Action taken by <br />the CWCB March 26, 2003." <br /> <br />When the Board approved this loan increase it attached several conditions: <br /> <br />1. A Feasibilitv Studv is reauired, John Van Sciver has reviewed the study titled <br />"Feasibility of the Rehabilitation of the Lowline Ditch Company Diversion Structure" by <br />Brent Nation, P,E., of Nation Engineering Services. The study meets the requirements <br />of the CWCB Constr~ction Fund Guidelines, and has been accepted by this office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.