My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150044 Approval letter
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
C150044 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2009 9:10:07 AM
Creation date
11/22/2006 9:44:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150044
Contractor Name
Riverside Reservoir and Land Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
HB 00-1419
Loan Projects - Doc Type
Approval Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Riverside Reservoir and Land Co. Agenda Item 15b. <br />March 20-21, 2000 (Updated March 22, 2000) <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Riverside Reservoir and Land Company <br /> <br />Project Name: Riverside Reservoir Diversion <br /> <br />Project Type: Rehabilitation <br /> <br />County: Morgan/Weld <br /> <br />Drainage Basin: South Platte Water Source: South Platte <br /> <br />Total Project Cost: $450,000 <br /> <br />Funding Sources: Company and CWCS <br /> <br />Type of Borrower: Agricultural <br /> <br />Median Household Income: N/A <br /> <br />CWCB Loan: $405,000 <br /> <br />Interest Rate: 4% Term: 30 years <br /> <br />CWCB Grant: $5,000 <br /> <br />Average Annual Volume of Water diverted: 113,111 acre-feet <br /> <br />The Riverside Reservoir diversion is located in Weld County, approximately 5 miles east of Kersey, on the <br />South Platte River, The Riverside Reservoir and Land Company operates the diversion to fill Riverside <br />Reservoir, and to supply water to 103 shareholders for irrigation of 50,000 acres of farmland. The <br />diversion is in poor condition and the Company needs to rehabilitate it in 2000. The average annual <br />volume diverted is 113,111 acre-feet. The Riverside Reservoir and Land Company is a mutual ditch <br />company and a nonprofit corporation registered in the State of Colorado, Jack Odor PE of G,A,S.P. will <br />complete the feasibility study. Proposed funding for the project consists of a CWCB loan for $405,000, and <br />$45,000 from the Company. The CWCS will provide grant funding for 50% of the cost of the Feasibility <br />study, up to a maximum of $5,000, <br /> <br />Location Map <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.